Correct FCA Deficiencies Construction

Response deadline
Sep 3, 2026
Due in 3 days
Date posted
Aug 31, 2026

Description

Correct FCA Deficiencies Construction - Solicitation The contractor shall be responsible for all aspects of the project and each phase shall be subject to VA approval at designated project milestones. This project includes (but not limited to) all labor, materials, supplies, equipment, services, training, lighting, communications, security, operation and maintenance manuals, as built drawings, permits (if necessary), construction, installation, and commissioning.

Classifications

Documents (16)

  • 36C77026R0006 0002.pdf
    .pdf84 KBNot yet available
  • Attachment 1 - Past Performance 36C77026R0006.docx
    .docx29 KBNot yet available
  • 36C77026R0006 0006.docx
    .docx118 KBNot yet available
  • PUBLIC 36C77026R0006 0002.pdf
    .pdf84 KBNot yet available
  • 03a - 762-24-101 FCA Drawings.pdf
    .pdf34.6 MBNot yet available
  • 36C77026R0006 0004 - Copy.docx
    .docx221 KBNot yet available
  • 36C77026R0006 0005 SF30 - Copy.docx
    .docx126 KBNot yet available
  • 36C77026R0006 - Atch 3 - AGENDA.docx
    .docx35 KBNot yet available
  • SPECIFICATIONS.pdf
    .pdf5.8 MBNot yet available
  • 03d - 762-24-101 FCA Geotech.pdf
    .pdf4.8 MBNot yet available
  • 36C77026R0006 0003.pdf
    .pdf1.4 MBNot yet available
  • 36C77026R0006 0003.docx
    .docx23 KBNot yet available
  • DAVIS BACON - TUCSON 1-2-26.pdf
    .pdf69 KBNot yet available
  • 36C77026R0006_2.docx
    .docx143 KBNot yet available
  • 03c - 762-24-101 FCA Topo.pdf
    .pdf972 KBNot yet available
  • 36C77026R0006 000115 MAY.docx
    .docx114 KBNot yet available