TBRD Water Leak Repair
- Response deadline
- Sep 7, 2026 Closed
- Date posted
- Sep 1, 2026
- Source
- Open notice
Description
Amendment 0001 - The purpose of this amendment is to attach the Questions and Answers and Site Visit Sign-In Sheet. This amendment also attaches an updated Schedule of Items, Attachment 5. Quote Due Date has not changed. The Tonto National Forest - Tonto Basin Ranger District - plans to repair leaks in its drinking water network. The main objective of the project is to eliminate the known leaks and reduce potential for future leaks. At the end of the project, the contractor shall provide as-built drawings of the project to the Forest Service. Leaks were noticed on the secondary pipes that feed 1- or 2-inch recreation hydrants. The Forest Service plans to relocate the hydrants to the main lines, abandoning the leaking pipes in place. One known leak to be repaired may be under the asphalt of the campground loop. After backfilling the trench, the contractor must place new asphalt over the cut portion and make necessary adjustments to return the loop to its original shape. The contractor shall install one priority valve and two pressure reduction valves at the locations indicated by the Contracting Officer's Representative (COR). These values are critical in reducing and addressing potential leaks in the future. The contractor shall provide all personnel, equipment, tools, and materials to accomplish the project. The contractor is responsible for the supervision, incidentals, and services required to perform the work in strict accordance with the applicable codes and requirements and the contract document.
Classifications
Documents (11)
- Attachment 7 - Drawings.pdf.pdf1.4 MBNot yet available
- 127EAX26Q0087 Amendment 0001.pdf.pdf116 KBNot yet available
- Attachment 1 - Statement of Work.docx.docx92 KBNot yet available
- Attachment 5 - Updated Schedule of Items.xlsx.xlsx14 KBNot yet available
- Site Visit Report- TBRD Water Leak Repair Project.docx.docx17 KBNot yet available
- 127EAX26Q0087 TBRD Water Leak Repair.pdf.pdf276 KBNot yet available
- Attachment 3 - Directional Maps.pdf.pdf509 KBNot yet available
- Attachment 2 - Industrial Fire Plan.pdf.pdf305 KBNot yet available
- Attachment 6 - Wage Determination.pdf.pdf234 KBNot yet available
- Attachment 5 - Schedule of Items.xlsx.xlsx12 KBNot yet available
- Attachment 4 - Pictures.docx.docx13.5 MBNot yet available
Contacts
Similar contracts
- Project 695-24-107 Replace Boilers 4 and 5 Clement J. Zablocki, VA Medical Center 5000 West National Avenue Milwaukee, WI 53295Due Nov 18, 2026
- CON-NRM-668-22-106 Correct Domestic Water SystemWashingtonDue Nov 23, 2026
- Z--Saf Frsp Geothermal HVAC SjdsVirginiaDue Oct 26, 2026
- Chiller Compressor Replacement at the Edward Hines Jr. VA Hospital (Hines) Building 228IllinoisDue Oct 20, 2026
- Troubleshoot & Repair of Portable Chillers Service RequirementTexasDue Oct 22, 2026
- TVHS AC VRF System InstallationTennesseeDue Oct 23, 2026