TBRD Water Leak Repair
- Response deadline
- Sep 7, 2026 Closed
- Date posted
- Aug 6, 2026
- Source
- Open notice
Description
The Tonto National Forest - Tonto Basin Ranger District - plans to repair leaks in its drinking water network. The main objective of the project is to eliminate the known leaks and reduce potential for future leaks. At the end of the project, the contractor shall provide as-built drawings of the project to the Forest Service. Leaks were noticed on the secondary pipes that feed 1- or 2-inch recreation hydrants. The Forest Service plans to relocate the hydrants to the main lines, abandoning the leaking pipes in place. One known leak to be repaired may be under the asphalt of the campground loop. After backfilling the trench, the contractor must place new asphalt over the cut portion and make necessary adjustments to return the loop to its original shape. The contractor shall install one priority valve and two pressure reduction valves at the locations indicated by the Contracting Officer's Representative (COR). These values are critical in reducing and addressing potential leaks in the future. The contractor shall provide all personnel, equipment, tools, and materials to accomplish the project. The contractor is responsible for the supervision, incidentals, and services required to perform the work in strict accordance with the applicable codes and requirements and the contract document.
Classifications
Documents (8)
- DownloadAttachment 7 - Drawings.pdf.pdf1.4 MB
- DownloadAttachment 1 - Statement of Work.docx.docx92 KB
- Download127EAX26Q0087 TBRD Water Leak Repair.pdf.pdf276 KB
- DownloadAttachment 3 - Directional Maps.pdf.pdf509 KB
- DownloadAttachment 2 - Industrial Fire Plan.pdf.pdf305 KB
- DownloadAttachment 6 - Wage Determination.pdf.pdf234 KB
- DownloadAttachment 5 - Schedule of Items.xlsx.xlsx12 KB
- DownloadAttachment 4 - Pictures.docx.docx13.5 MB
Contacts
Similar contracts
- E21 Prca HVAC ReplacementDue Oct 27, 2026
- Lower Monumental PH HVAC System UpgradeWashingtonDue Oct 5, 2026
- 16292 Steam Boiler ReplacementUtahDue Oct 19, 2026
- Con | Z1Da | Replace or Chillers | 580-23-105 | PresolicitationTexasDue Oct 12, 2026
- Con | Z2Da | Replace Chiller 1 B104 | 580-24-111 | PresolicitationTexasDue Oct 13, 2026
- AOML HVAC and BAS Controls Upgrade ProjectFloridaDue Sep 29, 2026