Reroute Power Supple at the Phoenix Rearing Facility
- Response deadline
- Aug 14, 2026 Closed
- Date posted
- Aug 5, 2026
- Source
- Open notice
Description
Reroute Power Supply POC: Erick Plamann, Contract Specialist, erick.plamann@usda.gov a licensed electrician remove the 2 conduit tripping hazard and reroute the supply power and control wires overhead to the mixing blender. The breaker panel for the 240-volt 3 phase supply power is located in the next room where the electrician will have to run new conduit through a wall to the mixing blender. The control wire panel is located within 10 feet from the mixing blender. We prefer that the electrician uses rigid conduit and seals all connections to prevent electrical arching. We do have fine dust particles from wheat and soy which can become highly flammable. The kitchen possesses a dust collecting system which gathers most of the dust particles. NAICS Code: 238210 This is being solicited 100% Small Business Magnitude: Under $25,000 Site Visit Date: 23 July 2026 Time: 10:00 AM Location: 3645 E. Chipman RD, Phoenix AZ 85040 POC: Marvin Draper POC Email: marvin.draper@usda.gov All question must be emailed (no other means will be accepted) to erick.plamann@usda.gov no later than 12:00 PM Central Time on 7/29/0226. All offers must be emailed (no other means will be accepted) to erick.plamann@usda.gov no later than 12:00 PM Central Time on 8/14/0226.
Classifications
Documents (8)
- DownloadC-1_Amendment 0002 Q and A.pdf.pdf94 KB
- DownloadC04_Attachment 3 Wage Determination.pdf.pdf150 KB
- DownloadC04_12639526Q0224.pdf.pdf299 KB
- DownloadC04_Attachment 2 SOW.docx.docx414 KB
- DownloadC04_Attachment 1 SOI v2.pdf.pdf72 KB
- Download12639526Q0224 A0001.pdf.pdf86 KB
- Download12639526Q0224 A0002.pdf.pdf87 KB
- Downloadsign in sheet for power reroute site walk 072326.pdf.pdf366 KB
Contacts
Similar contracts
- B118 Fire PanelOhioDue Sep 3, 2026
- Z1DA--460-26-007 | Electrical Distribution Inspection Repairs | NCO 4 Construction East (VA-26-00057558)Due Aug 19, 2026
- POWER SYSTEM GENERATOR & TRANSFER SWITCHES REPLACEDue Aug 28, 2026
- Removal and Replacement of Dishwasher BLDG 20226TexasDue Aug 26, 2026
- Ft. Leavenworth Fire Alarm and Mass Notification System Upgrade, $45M, 5 Year SATOCDue Sep 15, 2026
- Dishwasher Replacement B20626TexasDue Aug 26, 2026