56 CS FOC to Flightline and Wx Equipment, Luke AFB
- Response deadline
- Nov 9, 2026 Due in 33 days
- Date posted
- Oct 7, 2026
- Source
- Open notice
Description
This SOW defines the requirement for the Contractor to Engineer, Furnish, Install and Test (EFI&T) new 12-Strand (St), Single Mode (SM) Fiber Optic Cable (FOC) from Radar Approach Control (RAPCON, B979) to Air Traffic Control Tower (ATCT, B998), Base Operation (Ops)B453), Command Post (CP, B11), Localizer (B1375), Glide Slope (GS, B1056), Tactical Air Navigation (TACAN, B1049), Ground Antenna Transmit and Receive (GATR, B1040), Glide Slope (B1081 and Localizer (B1059). Also, 12-St SM FOC from Base Ops (B453) to Primary and Secondary Automatic Meteorological Station (FMQ-19s). The work will be performed at Luke AFB AZ by using new and existing Manhole/Handhole Duct System. Some portion of the cable route/path will be Direct Buried. The Contractor shall provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet the requirements as stated in this SOW. All equipment, supplies, or materials provided shall be new and not refurbished. No equipment, supplies, or material will be provided by the government. All materials used in this SOW must be rust-proof and corrosion-resistant, due to the nature of the environment. See attached Solicitation and supporting documents for additional information.
Classifications
Documents (6)
- Contractor Access to Department of the Air Force Installations.pdf.pdf124 KBNot yet available
- Anti-Terrorism Pamphlet.pdf.pdf851 KBNot yet available
- SOW-FOC to Flightline and Weather Related (Wx) Equipment - Corrected Table.pdf.pdf5.3 MBNot yet available
- Solicitation - FA488727Q0003.pdf.pdf533 KBNot yet available
- Ombudsman.pdf.pdf56 KBNot yet available
- Luke AFB Environmental Guide for Contractors.pdf.pdf7.4 MBNot yet available
Contacts
Similar contracts
- Market Survey for Procurement of Spares in Support of the Secure Mobile Anti-Jam Reliable Tactical (SMART-T) ProgramMarylandDue Oct 23, 2026
- Market Survey for Procurement of Spares in Support of the Secure Mobile Anti-Jam Reliable Tactical (SMART-T) ProgramMarylandDue Oct 23, 2026
- Communications Infrastructure MaterialsMarylandDue Sep 25, 2026
- Domaille Engineering Automatic Fiber Optic PolisherMissouriDue Sep 28, 2026
- Cable, Fiber OpticHawaiiDue Sep 10, 2026
- Cable Assembly, Fiber Optic 6020-01-643-1895PennsylvaniaDue Sep 21, 2026