249E Road Surfacing & Stabilization - Apache-Sitgreaves NF, AZ
- Response deadline
- Sep 3, 2026 Closed
- Date posted
- Aug 25, 2026
- Source
- Open notice
Description
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 127EAX26Q0071 is issued as a Request for Quotation (RFQ) for reestablishing the road template on NFSR 249E. Placement shall include the turnouts and parking area between South Cove (NFSR 249F) and Railroad Cove (NFSR 249G). Placement shall begin at the pavement at AZ-273 and continue west for approximately 5.29 miles to the intersection with NFSR 116. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 237310 - Highway, Street, and Bridge Construction. The small business size standard is $45.0M. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. Amendment 0001 - RFI Log 001-020 with answers
Classifications
Documents (12)
- C04 Attachment 3 MAP.pdf.pdf346 KBNot yet available
- C04 127EAX26Q0071.pdf.pdf1.0 MBNot yet available
- C04 Attachment 4 Spec Aggregates for Earthwork.pdf.pdf227 KBNot yet available
- C04 Attachment 2 Sched of Items.pdf.pdf182 KBNot yet available
- C04 Attachment 6 Specs FP-14.docx.docx129 KBNot yet available
- C04 Attachment 5 Aggregate Specifications.pdf.pdf176 KBNot yet available
- C04 Attachment 7 Fire Plan.pdf.pdf355 KBNot yet available
- C05 127EAX26Q0071 0001.pdf.pdf84 KBNot yet available
- C04 Attachment 8 BioPreferred.pdf.pdf1.3 MBNot yet available
- C05 RFI Log 001-020 answered.docx.docx23 KBNot yet available
- C04 Attachment 9 Wage Determination AZ20260023 Mod 1.pdf.pdf37 KBNot yet available
- C04 Attachment 1 Statement of Work.docx.docx30 KBNot yet available
Contacts
Similar contracts
- WA FWS LPO MULTI(1) Little Pend Oreille NWR Culvert ImprovementsWashingtonDue Oct 20, 2026
- Jake Rocks Road ReconstructionPennsylvaniaDue Oct 29, 2026
- Natchez Trace Parkway Project MS NP NATR 3F26MississippiDue Nov 3, 2026
- CO NP ROMO 407(1) Holzwarth CulvertColoradoDue Oct 27, 2026
- Helena - Lewis and Clark National Forest Dry Pole Pit Rock Crushing ServiceMontanaDue Oct 22, 2026
- Z--GOGA 336173 - Repair Conzelman RoadDue Oct 29, 2026