249E Road Surfacing & Stabilization - Apache-Sitgreaves NF, AZ
- Response deadline
- Sep 3, 2026 Due in 18 days
- Date posted
- Aug 4, 2026
- Source
- Open notice
Description
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 127EAX26Q0071 is issued as a Request for Quotation (RFQ) for reestablishing the road template on NFSR 249E. Placement shall include the turnouts and parking area between South Cove (NFSR 249F) and Railroad Cove (NFSR 249G). Placement shall begin at the pavement at AZ-273 and continue west for approximately 5.29 miles to the intersection with NFSR 116. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 237310 - Highway, Street, and Bridge Construction. The small business size standard is $45.0M. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.
Classifications
Documents (10)
- DownloadC04 Attachment 3 MAP.pdf.pdf346 KB
- DownloadC04 127EAX26Q0071.pdf.pdf1.0 MB
- DownloadC04 Attachment 4 Spec Aggregates for Earthwork.pdf.pdf227 KB
- DownloadC04 Attachment 2 Sched of Items.pdf.pdf182 KB
- DownloadC04 Attachment 6 Specs FP-14.docx.docx129 KB
- DownloadC04 Attachment 5 Aggregate Specifications.pdf.pdf176 KB
- DownloadC04 Attachment 7 Fire Plan.pdf.pdf355 KB
- DownloadC04 Attachment 8 BioPreferred.pdf.pdf1.3 MB
- DownloadC04 Attachment 9 Wage Determination AZ20260023 Mod 1.pdf.pdf37 KB
- DownloadC04 Attachment 1 Statement of Work.docx.docx30 KB
Contacts
Similar contracts
- WSMR Bridge Repair RR7B0003New MexicoDue Sep 8, 2026
- Improve Hamat RunwayDue Sep 14, 2026
- ZTL Childcare Facility Paving ProjectGeorgiaDue Sep 10, 2026
- Repair of Sergeant Major Boulevard at Fort Bliss, Texas.Due Sep 15, 2026
- Multiple Trail Bridges Replacement Project Phase 2GeorgiaDue Sep 8, 2026
- GOGA 319407 - Bridge PreservationDue Sep 14, 2026