Area 43/270 Perimeter Wall and Gate Replacement
- Response deadline
- Aug 17, 2026 Due in 1 day
- Date posted
- Jul 29, 2026
- Source
- Open notice
Description
This project encompasses the demolition and reconstruction of an existing perimeter boundary wall, along with associated site improvements. Work begins with erecting a temporary iron-sheet fence with razor wire for site security, followed by demolition of the existing wall, tree/root clearing, and removal of debris. Construction includes excavation to 900mm, concrete blinding, reinforced strip footings, columns, mid-height and top beams, and 200mm reinforced hollow blockwork with vertical and horizontal reinforcement. Walls receive plaster, roughcast finish, silicone primer, and weatherproof paint, plus bituminous coating on foundation walls. New razor wire is installed along the full perimeter and gate. A sliding vehicle gate (3.50m x 2.75m) with a pedestrian door, heavy-duty hardware, peep hole, and concertina wire will be fabricated to ASTM standards. Additional work includes perimeter drainage (brick-lined drains, catch pits, uPVC piping), guard house repairs (roof, door relocation, electrical outlets, drainage), screen wall restoration, and gate-area security lighting. The project concludes with site clean-up, landscape restoration, utility repairs, and repainting of affected surfaces. Contractors must follow strict material, testing, and safety standards (EM 385-1-1, BS/ASTM codes) throughout, with COR oversight on compaction, concrete quality, and reinforcement placement.
Classifications
Documents (1)
- DownloadSOW Perimeter wall 43-270 and Gate.pdf.pdf1.9 MB
Contacts
- lilongwegsoprocurement@state.gov265885961555
Similar contracts
- GUMO HOUSING STUCCODue Sep 14, 2026
- Snow Shelter Doors Removal & Replacement at NEXRADDue Aug 26, 2026
- Multi-Trade Exterior Building Sustainment (Masonry, Painting, and Gutter Repair) IDIQ – Grissom ARBIndianaDue Sep 4, 2026
- Z--Install new masonry barrier wall to include excavaDue Sep 3, 2026
- Arlington National Cemetery Boundary Wall Repairs Phase 6VirginiaDue Sep 4, 2026
- Gatehouse Chimney Demolition and Reconstruction, Union Village Dam, East Thetford, VTDue Aug 20, 2026