Civic AI
Civic AI
Procurement intelligence
SAM.gov12445126C0029
Open

Install and Repair Monitoring Systems at Dams

AGRICULTURE, DEPARTMENT OF · AR
Response deadline
Date posted
Jul 1, 2026

Description

The contractor shall provide all equipment, installation, components, terminals, enclosures, sensor probes, solar panels, batteries, controllers, mounting hardware, footings, cabling, supplies, materials, personnel, supervision, labor, quality control, transportation, shipping, mobilization, activation, incidentals, and warranty support for the completion of work. The contractor shall complete work at all listed sites for this project. New systems will be PMU-9101-T-WR monitoring units. All components must be assembled with hardware fasteners. Double sided tape will not be an acceptable means of assembly. The contractor shall mount each new unit on a 2 inch diameter steel pole. The contractor shall properly ground each unit. Where the pole is mounted on a dam embankment, the monitoring unit shall be 10 feet minimum above ground level. Cabling shall be placed underground from the pole to the shoreline. The contractor shall request approval from the COR for proposed locations of new systems.

Classifications

Documents (2)

  • Single Source Justification_Brand Name SIGNED.pdf
    .pdf205 KBNot yet available
  • Statement of Intent SIGNED.pdf
    .pdf232 KBNot yet available

Contacts

Explore more