SAM.gov127EAX26Q0052
Open
GAOA Blanchard Sewer Line Replacement Ozark St. Francis NF
- Response deadline
- Aug 25, 2026 Due in 29 days
- Date posted
- Jul 27, 2026
- Source
- Open notice
Description
This project will replace a section of the Blanchard Springs Recreation Area sewer collection system providing for full functionality, eliminating deferred maintenance and improving resiliency to extreme weather and flood events. Pressure sewer lines will be directionally drilled under North Sylamore Creek to prevent freezing and damage from floating debris. Gravity lines will be replaced or lined. Option items include rehabilitation of two pressure lift stations.
Classifications
Documents (9)
- C04e Attachment 5 Addendum Blanchard Sewer Line Replacemt 127EAX26Q0052.pdf.pdf94 KBNot yet available
- C04g Attachment 7 Site Visit Info 127EAX26Q0052.docx.docx113 KBNot yet available
- C04f Attachment 6 RFI Form 127EAX26Q0052.docx.docx29 KBNot yet available
- C04d Attachment 4 Narrative Blanchard Sewer Line Replacemt 127EAX26Q0052.pdf.pdf485 KBNot yet available
- C04 SF1442 127EAX26Q0052.pdf.pdf300 KBNot yet available
- C04c Attachment 3 Drawings Blanchard Sewer Line Replacemt 127EAX26Q0052.pdf.pdf8.9 MBNot yet available
- C04a Attachment 1 SOW Blanchard Sewer Line Replacemt 127EAX26Q0052.pdf.pdf59 KBNot yet available
- C04b Attachment 2 Specs Blanchard Sewer Line Replacemt 127EAX26Q0052.pdf.pdf4.1 MBNot yet available
- C04h Attachment 8 SOI Blanchard Sewer Line 127EAX26Q0052.xlsx.xlsx14 KBNot yet available
Contacts
Similar contracts
- CMR New Sewer LinesIT-RMDue Aug 28, 2026
- Repair Water Tower B738TXDue Aug 24, 2026
- Z2NE--CON Project 667-22-118, Replacement Underground Water TanksLADue Aug 7, 2026
- WWTP REPAIR CLARIFIER #2VADue Aug 19, 2026
- USFWS FLINT HILLS NWR, KS - PUMP REPLACEMENDue Aug 24, 2026
- MONITORING WELL ABANDONMENT, EASTON MDDue Aug 6, 2026