Replacement of Conference Room, and Command Suite Windows.
- Response deadline
- Aug 20, 2026 Due in 8 days
- Date posted
- Aug 12, 2026
- Source
- Open notice
Description
168 CES requests the replacement/upgrade of the existing windows and screens inside Bldg. 3127, third floor command suite and conference room. Replacement windows shall have a minimum Sound Transmission Classification (STC) of 40. The new replacement windows shall be triple pane glass with a thickness of 1-3/4”. The new windows casement/frame shall be fiberglass, and the color selections shall be submitted to 168 CES for final approval prior to purchasing. The new windows shall have the same opening and closing functions/operations as the existing windows. The existing blinds shall be removed during demolition and reinstalled after the new windows have been installed. Paint used shall match any existing interior/exterior colors in the areas of disturbance by window replacement, as needed. The new exterior windows shall have proper reflective window film to match existing windows on the south side of the bldg. 3127. Please see the Statement of Work (SOW) for the full requirement description. ----------------------------------------------- 29 July 2026 The purpose of this amendment is to update the combo document to include site visit verbiage, adjust the PoP to 15 weeks, and include an RFI Q/A doc. ----------------------------------------------- 7 Aug 2026 The purpose of this amendment is to extend closing date to 20 Aug 2026. ----------------------------------------------- 12 Aug 2026 The purpose of this amendment is to update the RFI tracker to include additional Q&As. Updated document uploaded is "Attachment 7 - RFI Tracker v2".
Classifications
Documents (13)
- DownloadAmended Combo 2026 - Window Repair.pdf.pdf240 KB
- DownloadCombo 2026 - Window Repair.pdf.pdf233 KB
- DownloadAmended2 Combo 2026 - Window Repair.pdf.pdf275 KB
- DownloadAttachment 6 - Wage Determination.pdf.pdf670 KB
- DownloadAttachment 7 - RFI Tracker v2.xlsx.xlsx13 KB
- DownloadAttachment 5 - Provisions and Clauses.pdf.pdf376 KB
- DownloadAttachment 1 - Representative Window Layouts.pdf.pdf1.0 MB
- DownloadAttachment 7 - RFI Tracker.xlsx.xlsx13 KB
- DownloadAttachment 3 - Submittal Register.xlsx.xlsx20 KB
- DownloadAttachment 3 - Submittal Register.pdf.pdf118 KB
- DownloadAttachment 4 - Repair Conference Room Windows B3127 SOW v2.pdf.pdf160 KB
- DownloadAttachment 4 - Repair Conference Room Windows B3127 SOW.pdf.pdf130 KB
- DownloadAttachment 2 - 3rd Floor Layout.pdf.pdf112 KB
Contacts
- daniel.pankratz.3@us.af.mil907-377-8747
- nicholas.rogers.31@us.af.mil9073778741
Similar contracts
- CHANCERY BATHROOM MODERNIZATIONBogotáDue Sep 1, 2026
- Design-Build Warehouse Construction Services, U.S. Embassy Kolonia, Federated States of MicronesiaPohnpeiDue Sep 10, 2026
- Fort Campbell Air Traffic Control Tower Due Aug 25, 2026
- INDUSTRY DAY AND MARKET SURVEY NOTICE for new ATCT Project at (FLL) Fort Lauderdale-Hollywood International AirportFloridaDue Aug 27, 2026
- Sources Sought Notice_IMCOM Playgrounds SATOCDue Aug 26, 2026
- N33191-26-R-0032 D-B Maritime Center of Excellence Phase III TunisiaDue Sep 11, 2026