Civic AI
Civic AI
Procurement intelligence
SAM.govW50S6K-26-Q-A001
Open

Replacement of Conference Room, and Command Suite Windows.

DEPT OF DEFENSE · Alaska
Response deadline
Aug 20, 2026
Due in 8 days
Date posted
Aug 12, 2026

Description

168 CES requests the replacement/upgrade of the existing windows and screens inside Bldg. 3127, third floor command suite and conference room. Replacement windows shall have a minimum Sound Transmission Classification (STC) of 40. The new replacement windows shall be triple pane glass with a thickness of 1-3/4”. The new windows casement/frame shall be fiberglass, and the color selections shall be submitted to 168 CES for final approval prior to purchasing. The new windows shall have the same opening and closing functions/operations as the existing windows. The existing blinds shall be removed during demolition and reinstalled after the new windows have been installed. Paint used shall match any existing interior/exterior colors in the areas of disturbance by window replacement, as needed. The new exterior windows shall have proper reflective window film to match existing windows on the south side of the bldg. 3127. Please see the Statement of Work (SOW) for the full requirement description. ----------------------------------------------- 29 July 2026 The purpose of this amendment is to update the combo document to include site visit verbiage, adjust the PoP to 15 weeks, and include an RFI Q/A doc. ----------------------------------------------- 7 Aug 2026 The purpose of this amendment is to extend closing date to 20 Aug 2026. ----------------------------------------------- 12 Aug 2026 The purpose of this amendment is to update the RFI tracker to include additional Q&As. Updated document uploaded is "Attachment 7 - RFI Tracker v2".

Classifications

Documents (13)

  • Amended Combo 2026 - Window Repair.pdf
    .pdf240 KB
    Download
  • Combo 2026 - Window Repair.pdf
    .pdf233 KB
    Download
  • Amended2 Combo 2026 - Window Repair.pdf
    .pdf275 KB
    Download
  • Attachment 6 - Wage Determination.pdf
    .pdf670 KB
    Download
  • Attachment 7 - RFI Tracker v2.xlsx
    .xlsx13 KB
    Download
  • Attachment 5 - Provisions and Clauses.pdf
    .pdf376 KB
    Download
  • Attachment 1 - Representative Window Layouts.pdf
    .pdf1.0 MB
    Download
  • Attachment 7 - RFI Tracker.xlsx
    .xlsx13 KB
    Download
  • Attachment 3 - Submittal Register.xlsx
    .xlsx20 KB
    Download
  • Attachment 3 - Submittal Register.pdf
    .pdf118 KB
    Download
  • Attachment 4 - Repair Conference Room Windows B3127 SOW v2.pdf
    .pdf160 KB
    Download
  • Attachment 4 - Repair Conference Room Windows B3127 SOW.pdf
    .pdf130 KB
    Download
  • Attachment 2 - 3rd Floor Layout.pdf
    .pdf112 KB
    Download

Contacts

Similar contracts

Explore more