117 Sewer Pipe Realignment
- Response deadline
- Sep 8, 2026 Due in 18 days
- Date posted
- Aug 21, 2026
- Source
- Open notice
Description
The 117th Air Refueling Wing, Birmingham, Alabama has a rerequiremet for non-personal services of conducting a full inspection and reapirs of existing piping systems within 6 facilities. The contractor shall provide all personnel, equipment, supplies, supervision and any other items and services necessary to perform the work as described in the attached Statement of Work. This requirement is being solicited via the attached Standard Form (SF) 1449. The Government intends to award a Firm Fixed Price (FFP) contract to the reponsible vendor whose offer, conforming to the solicitation, is determined to be the most advantageous to the Government, that has the Lowest Price Technically Acceptable. Questions Regarding this Solicitation All questions must be submitted in writing via email to MSgt Jonathan Werkmeister at jonathan.werkmeister@us.af.mil. Questions must be recieved with sufficient time to allow for a response prior to the offer submission deadline. Please reference solicitation number W50S6M26QA014 in the subject line. Submission of Offers Offers must be submitted electronically to MSgt Jonathan Werkmeister at jonathan.werkmeister@us.af.mil and william.hall.65@us.af.mil no later than the response date and time. A complete offer package must include: A signed and completed SF 1449, including the Offer Section (Blocks 14-20). A completed Section B Contract Line Item Number (CLIN) Schedule with princing. Completed representations and certifications as required in the solcitation and document (or confirmation of current registration in SAM.gov). A minimum of two(2), and a maximum of three(3), past performance references for recent and relevant projects. Acknowledgement of any and all amendments isued. Offerorers are reponsible for monitoring this site for the release of any amendments. All offerors must be registered in the System for Award Management (SAM.gov) to be eligible for award.
Classifications
Documents (4)
- Service Contract Wage Determination.pdf.pdf252 KBNot yet available
- SOW Pipe Re-aligment.docx.docx206 KBNot yet available
- Solicitation Amendment W50S6M26QA0140001 SF 30 KO Signed.pdf.pdf3.8 MBNot yet available
- Solicitation Amendment - W50S6M26QA0140001.pdf.pdf4.3 MBNot yet available
Contacts
Similar contracts
- Chiller Coil ReplacementDelawareDue Aug 31, 2026
- Supply and replace well head cap and an approximately 18-inch vertical extension, Guilford CTConnecticutDue Aug 24, 2026
- Cooling TowerDue Sep 4, 2026
- REPLACE AIR HANDLING UNIT BLDG 2272CaliforniaDue Sep 11, 2026
- BGNDRF HVAC REPLACEMENT AND MAINTENANCEDue Sep 21, 2026
- Barrier IIB Chiller Piping ReworkDue Sep 3, 2026