Anniston Army Depot FORGE II Other Transaction Authority (OTA) Request for Project Proposal (RPP) - W91QEY-26-R-A002
- Response deadline
- Jun 29, 2026 Closed
- Date posted
- Jun 17, 2026
- Source
- Open notice
Description
Effective 17 June 2026: The Sign-in Sheet from the ANAD FORGE II Site Visit on 10 June 2026 is attached. Effective 10 June 2026: Questions are now due 15 June 2026 at 6:00 AM EDT Effective 9 June 2026: Answers to the DRAFT RPP QA have been posted. See attachment QA_ANAD_FORGE_II_DRAFT RPP. The RPP has been amended to provide supplemental project information. Please see pages 20-21 of W91QEY-26-R-A002_ANAD_FORGE2_Amend2 for the complete, updated list of attachments. All other information within this announcement remains unchanged. Effective 3 June 2026, the following attachments has been added to this notice W91QEY-26-R-A002_ANAD_FORGE2_Amend1 and ANAD FORGE II_Site Visit Agenda_10JUN26. The following two (2) changes were made to the RPP: The RPP due date has been updated to 29 June 2026 at 7:00AM CDT to match the due date listed on the SAM.gov posting. The Project Labor Agreement (PLA) language has been officially REMOVED from the RPP and is no longer applicable for this requirement. This announcement is a formal Request for Project Proposals (RPP) issued by the Mission & Installation Contracting Command (MICC) Theater Support Center (TSC) on behalf of Anniston Army Depot (ANAD) Facilities, Operations, Readiness, Growth and Experience (FORGE) II. RPP number W91QEY-26-R-A002. This is the final RPP and supersedes all prior drafts. Interested industry partners are invited to attend a site visit scheduled for June 10, 2026. A detailed agenda for this site visit will be provided at a later date. Note: Computer Aided Design (CAD) Files (RPP attachments 0001.8, 0002.1, and 0003.1 are available upon request). Note: Many documents are controlled access. The prospective prime contractors requesting document access, must verify they are able to receive and secure a digital document that is marked official use only or controlled unclassified information. Key Milestones & Submission Details Industry Questions Due Date: June 5, 2026 at 12:00 PM EDT Must use attached worksheet QA_ANAD_FORGE II and submit via email to the address below. Questions Submission Email: usarmy.jbsa.acc-micc.mbx.tsc-div1@army.mil Project Proposals Due Date: June 29, 2026 at 0700 AM CDT Submission instructions are detailed in the final RPP. Site Visit Date: June 10, 2026 Location and detailed agenda to be provided. Attendance is by prior registration only. Please register by sending the attached worksheet ANAD FORGE 2.0 Site Visit Registration to the below point of contacts, at, usarmy.jbsa.acc-micc.mbx.tsc-div1@army.mil, by 12:00 PM EDT on June 4, 2026. Points of Contact & Correspondence Primary POCs Agreements Officer: Jennifer Hastedt Agreements Specialists: Winston Franks, Lori Swade, and Jessica Ecker
Classifications
- NAICS236220
Documents (57)
- 0003_ANAD_MILCON_Project_3_Paint_Facility_May_26_2026.pdf.pdf96.8 MBNot yet available
- 0001.13_1G.4_Boring Locations - CRF Building.xlsx.xlsx29 KBNot yet available
- 0002.4_2A.4_MMF_Process Maps_Level 2.pdf.pdf162 KBNot yet available
- DownloadW91QEY-26-R-A002_ANAD_FORGE2_Final.pdf.pdf297 KB
- 0002.3_2A.3_MMF_Process Maps_Level 1.pdf.pdf136 KBNot yet available
- 0008_ANAD_Design_Guide.pdf.pdf64.5 MBNot yet available
- 0001.16_1H.1_CRF Utility Tie In Option 1.pdf.pdf736 KBNot yet available
- DownloadW91QEY-26-R-A002_ANAD_FORGE2_Amend2.pdf.pdf320 KB
- 0001.11_1G.2_Anniston Combined Logs.pdf.pdf18.8 MBNot yet available
- 0002.8_2D.4_Missile Maintenance ANAD Base Bid.pdf.pdf55.4 MBNot yet available
- 0001.12_1G.3_Anniston Combined Logs_14Feb24.pdf.pdf351 KBNot yet available
- 0001.2_ANAD_CRF_draft_COE_RFP_Redacted_final_compress.pdf.pdf118.6 MBNot yet available
- DownloadANAD FORGE 2.0 Site Visit Registration.xlsx.xlsx20 KB
- 0001.9_1F_CRF Construction Zone & Laydown v3.pdf.pdf638 KBNot yet available
- 0002.10_2G.1_GEOTECH THAAD Subsurface Investigation Report and Appendix A.pdf.pdf1.7 MBNot yet available
- 0002.11_2G_Guided Missile Maintenance- Geotech Report.pdf.pdf8.5 MBNot yet available
- Download0007_ANAD_Terms_and_Conditions_May_26_2026.pdf.pdf616 KB
- 0003.3_3D.3_ANAD-PF_35% Design Analysis Manual - FINAL.pdf.pdf146.5 MBNot yet available
- 0004.4_4H_Combat Vehicle Storage Bldgs. Utility Tie In Map.pdf.pdf814 KBNot yet available
- DownloadANAD FORGE II_Site Visit Agenda_10JUN26.pdf.pdf102 KB
- 0003.8_3H_Final Paint Utility Tie In 2.pdf.pdf845 KBNot yet available
- 0002_ANAD_MILCON_Project_2_Missile_Maintenance_Facility_May_26_2026.pdf.pdf54.8 MBNot yet available
- 0002.12_2H.1_Guided Missile Maintenance Facility_THAAD Utility Tie In Map.pdf.pdf707 KBNot yet available
- DownloadQA_ANAD_FORGE II.xlsx.xlsx24 KB
- DownloadQA_ANAD_FORGE_II_DRAFT RPP.pdf.pdf146 KB
- 0001_ANAD_MILCON_Project_1_Component_Remanufacture_Facility_May_26_2026.pdf.pdf3.7 MBNot yet available
- 0003.5_3F_Final Paint Laydown.pdf.pdf607 KBNot yet available
- 0002.13_2H.2_Fire Flow Test_BLD 705_05-17-17.pdf.pdf236 KBNot yet available
- 0001.10_1G.1_CRF and SRM Geotech RFP Report.pdf.pdf19.4 MBNot yet available
- 0001.18_1H.3_CRF Tie In Option 3.pdf.pdf735 KBNot yet available
- 0003.6_3G.1_Final Paint GEOTECH - BORING LOGS.pdf.pdf959 KBNot yet available
- 0002.5_2D.1 Guided Missile Maintenance-35% Corrected Drawings-26Sep25.pdf.pdf61.1 MBNot yet available
- 0004_ANAD_MILCON_Project_4_Storage_Facility_May_26_2026.pdf.pdf2.8 MBNot yet available
- 0002.7_2D.3_Guided Missile Maintenance-35% Corrected BOD-26Sep25.pdf.pdf124.7 MBNot yet available
- 0004.2_4D.2_Combat Vehicle Storage Bldgs._PC Report 2025.pdf.pdf171.8 MBNot yet available
- 0003.2_3D.2_Final Paint Facility_35pct Design Submittal Specs.pdf.pdf45 KBNot yet available
- 0001.1_Anniston_CRF_Draft_RFP_Design_Analysis_Redacted.pdf.pdf207.0 MBNot yet available
- 0003.4_3D.4_Final Paint Site DEMO Structures.pdf.pdf119 KBNot yet available
- 0001.6_ANAD_CRF_Geo_Redacted.pdf.pdf42.2 MBNot yet available
- Download0006_ANAD_Statement_of_Objectives_May_26_2026.pdf.pdf159 KB
- 0002.9_2F_Guided Missile Maintenance Facility THAAD Laydown.pdf.pdf852 KBNot yet available
- 0002.2_2A.2_USACE_Advanced_Modeling_PxP_Submittal_Review_Checklist_MMF.pdf.pdf2.0 MBNot yet available
- DownloadW91QEY-26-R-A002_ANAD_FORGE2_Amend3.pdf.pdf319 KB
- 0003.7_3G.2_Final Paint GEOTECH- BORING LOG PLAN.pdf.pdf325 KBNot yet available
- 0004.3_4F_Combat Vehicle Storage Bldg. Warehouse Laydown.pdf.pdf672 KBNot yet available
- 0001.17_1H.2_CRF Tie In Option 2.pdf.pdf735 KBNot yet available
- 0001.3_ANAD_BLDG122_EnvReport_Redacted.pdf.pdf8.7 MBNot yet available
- 0001.14_1G.5_CRF and SRM Geotech RFP Report_Final.pdf.pdf19.5 MBNot yet available
- DownloadW91QEY-26-R-A002_ANAD_FORGE2_Amend1.pdf.pdf325 KB
- 0001.7_ANAD_CRF_Env_Inspection_Redacted.pdf.pdf10.5 MBNot yet available
- 0001.15_1G.6_SRM Boring Logs.pdf.pdf17.0 MBNot yet available
- DownloadANAD FORGE II_Site Visit_Sign-in_10JUNE26 (2)_Redacted.pdf.pdf5.8 MB
- 0004.1_4D.1_Combat Vehicle Support Warehouse_ ANAD_PDR_04.15.26.pdf.pdf56.8 MBNot yet available
- Download0005_ANAD_ALIN Structure_May_26_2026.xlsx.xlsx26 KB
- 0001.4_ANAD_BLDG122_ LeadPaint_Redacted.pdf.pdf7.3 MBNot yet available
- 0002.6_2D.2_Guided Missile Maintenance-35% Corrected Specs TOC-26Sep25.pdf.pdf46 KBNot yet available
- 0001.5_ANAD_CRF_BLDG120_LeadPaint_Redacted.pdf.pdf7.4 MBNot yet available
Contacts
- MICC TSC Division 1 - PLEASE EMAIL HERE FIRST
- Jennifer Hastedtjennifer.l.hastedt2.civ@army.mil520-944-7122