SAM.gov140FC326Q0048
Open
Ak-Yukon Delta Nwr-Mx Entry Pilings
- Response deadline
- Sep 14, 2026 Closed
- Date posted
- Aug 11, 2026
- Source
- Open notice
Description
AK-YUKON DELTA NWR-MX ENTRY PILINGS
Classifications
Documents (1)
- DownloadSol_140FC326Q0048.pdf.pdf5.1 MB
Contacts
- jessica_tines@fws.gov0000000000
Similar contracts
- Y--NOAA/USCG Cutter STORIS Homeporting ProjectDue Oct 16, 2026
- Gulf Intracoastal Waterway High Island to Causeway with Channel to Port Bolivar Maintenance DredgingDue Oct 29, 2026
- Sandbridge Beach Erosion and Hurricane Protection Beach Renourishment ProjectDue Oct 2, 2026
- Sources Sought: The Dalles Dam Gate Repair Pit Fire Protection and Life Safety UpgradesDue Oct 15, 2026
- Chief Joseph Dam (CJD) Intake Concrete Stairs RepairWashingtonDue Oct 13, 2026
- Coastwide Beach and Dune Ecosystem RestorationDue Oct 30, 2026