TAP: Palmer-Fishhook Separated Pathway: Trunk Road to Edgerton Parks Road Cultural Resource Services
- Response deadline
- Jul 29, 2026 Due in 3 days
- Date posted
- Jul 14, 2026
- Source
- Open notice
Description
The TAP: Palmer-Fishhook Separated Pathway: Trunk Road to Edgerton Parks Road project will construct a separated, paved, non-motorized pathway from Trunk Road to Edgerton Parks Road. This project may also include: grading, culverts, including fish passage improvements, improved ditching, roadside hardware, utility relocation, vegetation clearing, landscaping, and signs. The Contractor shall provide Historic and Cultural Resources support for the project. Contractor services include: Historic and Cultural Resources and Initiation and Findings Letters. Contractor shall conduct a cultural resource investigation, including providing a cultural survey and determination of eligibility (DOE) for historic structures, compliant with Section 106 of the National Historic Preservation Act (36 CFR 800) and the Alaska Historic Preservation Act (A.S. 41.35.070), for the subject project. Eligibility: Eligible
Documents (1)
- Request for ProposalNot yet available
Similar contracts
- DUT Vehicle Access Gate ReplacementAKDue Aug 19, 2026
- KTN Airport Seaplane Ramp & Haul-Out RefurbishmentAKDue Aug 13, 2026
- Parks Highway Milepost 99 to 163 Drainage and Culvert Improvements Value Engineering StudyAKDue Jul 31, 2026
- ANC Gates N1 and B3 Passenger Boarding Bridge Replacements Design-BuildAKDue Aug 14, 2026
- Copper River Highway Odiak Slough Culvert ReplacementAKDue Aug 13, 2026
- HSIP: Anchorage Flashing Yellow Arrow and Signal Head Display Improvements, Appraisal, Acquisition and Relocation ServicAKDue Aug 13, 2026