bidxCSHWY01359-A
Open
Seward Highway Safety Improvements 2025 Drilling Services Rebid
- Response deadline
- Aug 28, 2026 Due in 20 days
- Date posted
- Aug 7, 2026
- Source
- Open notice
Description
This state funded project will perform drilling on the Seward Highway MP 58-60. Drilling work is in support of gathering geotechnical design data. Approximately 13 on-road test holes will be drilled to 30 feet in depth and 3 test pits to 2-5 feet in depth are planned. Field work will be supervised by an Engineering Geologist. Counties: Kenai Peninsula Eligibility: Eligible
Documents (1)
- SpecificationsNot yet available
Similar contracts
- Dalton Hwy MP 305-335 Reconstruction Value Engineering StudyAKDue Sep 2, 2026
- Noatak Airport RelocationAKDue Aug 18, 2026
- ANC Taxiway Z Extension West Phase 1AKDue Aug 26, 2026
- FAI Terminal Bathroom Remodel Design-BuildAKDue Aug 21, 2026
- Barrow Airport Apron Culvert ReplacementAKDue Aug 20, 2026
- Central Region Drainage Inspection and Condition Assessment ServicesAKDue Aug 20, 2026