Fairbanks Armory - Fire Damage Repair Project
- Response deadline
- Jul 8, 2026 Closed
- Date posted
- Jun 23, 2026
- Source
- Open notice
Description
STATE OF ALASKA DEPARTMENT OF MILITARY AND VETERANS AFFAIRS (DMVA) INVITATION TO BID – 2 nd SOLICITATION Sealed bids for the DMVA Fairbanks Armory Fire Damage Rebuild Project , Project Number: 02B0526017 , will be received before 1:00 p.m. July 7 th , 2026, at 57024 Roosevelt Road, JBER, AK 99505 or via electronic delivery as stated herein. The State funded project will replace and rebuild all damage associated with a recent fire that took place at the Alask Army National Guard Armory at 202 Wien Street, Fairbanks, AK 99701. The Engineer’s estimate is between $750,000.00 and $1,100,000.00 . the project substantial completion date will be February 26 th , 2027 . Bidders intending to participate are requested to notify the Project Manager, Greg Walker, at greg.walker@alaska.gov prior to the close of business on July 1, 2026 Individuals with disabilities, including the hearing impaired, who may need auxiliary aids, services, and/or special modifications to submit a bid/proposal should contact the project manager a 907-428-7693. Attachments, History, Details Attachments Addendum 1 - Fairbanks Armory Fire Rebuild Project.pdf As-built - Mechanical Controls - SIEMENS.pdf Copy of Siemens Boiler Room Points.pdf Doc1 - Fire Damage.pdf Doc2 - Fire Damage Current Condition.pdf Doc3 - Boilers Pre-fire.pdf Doc4 - Boiler Room Pre-Fire W-Pumps.pdf Doc5 - Boiler Room Pre-Fire Pumps & Day Tank.pdf Doc6- Boiler Room Pre-Fire Roof and Exterior..pdf Fairbanks Armory - Fire Damage Area AAA.pdf Fairbanks Armory - Fire Damage Area AAA.pdf ITB-Fairbanks Armory Fire Damage Repair Proj. II.pdf Structural Evaluation Report - Fairbanks Armory 24 March 2026.pdf Revision History Created 6/23/2026 12:04:47 PM by gewalker Modified 6/24/2026 8:31:34 AM by gewalker Modified 7/1/2026 11:50:01 AM by gewalker
Documents (12)
- DownloadITB-Fairbanks Armory Fire Damage Repair Proj. II.pdf11.8 MB
- DownloadFairbanks Armory - Fire Damage Area AAA.pdf569 KB
- DownloadDoc1 - Fire Damage.pdf1.8 MB
- DownloadDoc2 - Fire Damage Current Condition.pdf763 KB
- DownloadDoc3 - Boilers Pre-fire.pdf847 KB
- DownloadDoc4 - Boiler Room Pre-Fire W-Pumps.pdf1.7 MB
- DownloadDoc5 - Boiler Room Pre-Fire Pumps & Day Tank.pdf2.1 MB
- DownloadDoc6- Boiler Room Pre-Fire Roof and Exterior..pdf458 KB
- DownloadAs-built - Mechanical Controls - SIEMENS.pdf8.8 MB
- DownloadCopy of Siemens Boiler Room Points.pdf68 KB
- DownloadStructural Evaluation Report - Fairbanks Armory 24 March 2026.pdf2.3 MB
- DownloadAddendum 1 - Fairbanks Armory Fire Rebuild Project.pdf313 KB
Contacts
- Contact