bidxCFAPT01510
Open
ANC Gates N1 and C3 Passenger Boarding Bridge Replacements Design-Build
- Response deadline
- Aug 14, 2026 Closed
- Date posted
- Jul 23, 2026
- Source
- Open notice
Description
This federally funded contract includes all necessary design and construction services to replace the existing passenger boarding bridges located at Gates N1 in the North Terminal, and C3 in the South Terminal at Ted Stevens Anchorage International Airport. Counties: Anchorage Eligibility: Eligible
Documents (2)
- Request for ProposalNot yet available
- Supplemental InformationNot yet available
Similar contracts
- 3-02-0082-___-____AKDue Sep 15, 2026
- Adak Airport Runway, Taxiway, and Apron Pavement Rehabilitation- Design ServicesAKDue Sep 5, 2026
- Gustavus Ferry Terminal Generator ReplacementAKDue Sep 10, 2026
- KTN Airport Seaplane Ramp & Haulout RefurbishmentAKDue Aug 21, 2026
- Dalton Hwy MP 305-335 Reconstruction Value Engineering StudyAKDue Sep 2, 2026
- Seward Highway Safety Improvements 2025 Drilling Services RebidAKDue Aug 28, 2026