bidxCFAPT01510
Open
ANC Gates N1 and B3 Passenger Boarding Bridge Replacements Design-Build
- Response deadline
- Aug 14, 2026 Due in 19 days
- Date posted
- Jul 23, 2026
- Source
- Open notice
Description
This federally funded contract includes all necessary design and construction services to replace the existing passenger boarding bridges located at Gates N1 in the North Terminal, and C3 in the South Terminal at Ted Stevens Anchorage International Airport. Counties: Anchorage Eligibility: Eligible
Documents (2)
- Request for ProposalNot yet available
- Supplemental InformationNot yet available
Similar contracts
- DUT Vehicle Access Gate ReplacementAKDue Aug 19, 2026
- KTN Airport Seaplane Ramp & Haul-Out RefurbishmentAKDue Aug 13, 2026
- Parks Highway Milepost 99 to 163 Drainage and Culvert Improvements Value Engineering StudyAKDue Jul 31, 2026
- Copper River Highway Odiak Slough Culvert ReplacementAKDue Aug 13, 2026
- HSIP: Anchorage Flashing Yellow Arrow and Signal Head Display Improvements, Appraisal, Acquisition and Relocation ServicAKDue Aug 13, 2026
- Elliott Highway Milepost 137-149 and Tofty/Tanana Road Emergency Repairs – June 2026AKDue Aug 11, 2026