AMHS Mainliner Replacement Vessel- Naval Architecture and Marine Engineering Services
- Response deadline
- Aug 19, 2026 Closed
- Date posted
- Jul 28, 2026
- Source
- Open notice
Description
The selected Naval Architecture and Marine Engineering firm shall design a new build ferry to meet Alaska Marine Highway System?s operational and performance requirements for vessels to service Southcentral and Southeast Alaska Ports. The Primary Range of Operations shall be from Bellingham, WA to Whittier, AK. The design phase of the project spans all activities of preliminary vessel design through advertisement for construction of a new mainline vessel, followed by Construction Support as required by the Department. The final design product will be a set of plans, specifications and estimate (PS&E) assembly adequate to obtain competitive bids and detailed enough to construct the project. During this phase, additional requirements may include model testing, preparation of design study reports, assistance with environmental documents, public outreach meetings, value engineering studies. Following completion of PS&E the Consultant must be available to provide engineering interpretation of the PS&E assembly during bidding. Following successful bidding the Consultant must be available to assist the State through completion of Construction, Warranty, and Project Closure. Eligibility: Eligible
Documents (2)
- Request for ProposalNot yet available
- Supplemental InformationNot yet available
Similar contracts
- This federally funded contract will design and construct a new wildland firefighter crew facility at the Department of Natural Resources complex at 3700 AirportAKDue Oct 21, 2026
- AMHS M/V Tazlina Crew Quarters InstallationAKDue Oct 13, 2026
- Tununak Airport RehabilitationAKDue Oct 16, 2026
- Richardson Highway MP 275-298 Rehabilitation Value Engineering StudyAKDue Oct 10, 2026
- Wasilla-Fishhook Road - Main Street RehabilitationAKDue Oct 2, 2026
- Yakutat Ferry Terminal Reconstruction- Design ServicesAKDue Oct 10, 2026