AMHS M/V Tazlina Crew Quarters Installation
- Response deadline
- Jan 14, 2027 Due in 79 days
- Date posted
- Oct 26, 2026
- Source
- Open notice
Description
Fund Construction modifications to the M/V Tazlina to incorporate sleeping quarters for up to 24 persons, add 8 single person staterooms on the Bridge Deck, and 8 two?]person staterooms on the Upper Deck. Additional work includes the installation of a Galley; Scullery; Mess Spaces on the Upper Deck; modify the EGR Fuel System; a new Fan Room on the Bridge Deck; modifications to the existing passenger dining area; extensions to the existing port stair tower to provide Crew access to the Bridge Deck; construct storage and office on the Passenger Deck; modify Passenger Deck Childrens Play Area; perform coatings and protection upgrades; and perform State Funded Annual Overhaul Work and upgrades. Following removals required for construction, the vessel shall be modified by addition of the new structure, piping, electrical, toilet/shower modules, lighting fixtures, ceiling, wall insulation and linings, deck coverings, furniture, galley equipment and fixtures necessary to accommodate the revised vessel arrangement. All ancillary work required to complete the modifications shall be included in this project. The department requests authorization to use funds for in?-state and out?-of-state travel to manage construction at a shipyard. Counties: Statewide Eligibility: Eligible
Documents (6)
- PlansNot yet available
- Notice to BiddersNot yet available
- AddendumNot yet available
- SpecificationsNot yet available
- Supplemental InformationNot yet available
- Bid Forms EBSX FileNot yet available
Similar contracts
- DOT&PF seeks multidisciplinary professional engineering services for the Port MacKenzie Multimodal Freight Expansion Project. Services will include project manaAKDue Nov 20, 2026
- Replace the damaged and plugged culvert beneath Glacier Highway between Radcliffe Rd. and Alder Ct. Refurbish or reconstruct ditches and storm drains along the AKDue Nov 5, 2026
- Reconstruct pedestrian facilities and adjacent areas on 6th Avenue and 7th Avenue in Fairbanks. Project includes drainage improvements, roadside hardware, and uAKDue Nov 17, 2026
- White Mountain Crew Facility Design-BuildAKDue Nov 5, 2026
- KTN Ferry Terminal Mechanical & Electrical ImprovementsAKDue Nov 19, 2026
- JNU Glacier Hwy NAKDue Oct 27, 2026