Civic AI
Civic AI
Procurement intelligence
ak_public_notices224461
Open

Alaska Oil and Gas Conservation Commission

Commerce, Community, and Economic Development · AK
Response deadline
Sep 1, 2026
Due in 47 days
Date posted
Jul 14, 2026

Description

Notice of Public Hearing STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION RE: Docket Number: CO-26-007 Hilcorp Alaska, LLC’s Spacing Exception Application for Wells MPU H-35 and H-37 Milne Point Unit, North Slope Borough, Alaska Hilcorp Alaska, LLC (Hilcorp), by letter dated July 2, 2026, filed an application with the Alaska Oil and Gas Conservation Commission (AOGCC) for an exception to the spacing requirements of Conservation Order 477B Rule 2 to drill, complete, short-term pre-produce (flow back for up to 60 days), and inject into the Milne Point Unit H-35 injection well and the Milne Point Unit H-37 injection well in the Schrader Bluff Oil Pool within 500 feet of the exterior boundary of the Schrader Bluff Oil Pool Affected Area, pursuant to 20 AAC 25.055(d). MPU H-35 Surface Location: 2167' FNL, 1321' FWL, Section 34, T13N, R10E, Umiat Meridian (UM) Target Location (Estimated): 33' FSL, 67’ FWL, Section 34, T13N, R10E, UM Bottom Hole Location: 70' FSL, 70’ FWL, Section 11, T12N, R10E, UM MPU H-37 Surface Location: 2130' FNL, 1410' FWL, Section 34, T13N, R10E, UM Target Location (Estimated): 340' FSL, 1278’ FWL, Section 34, T13N, R10E, UM Bottom Hole Location: 70' FSL, 1764’ FWL, Section 11, T12N, R10E, UM Well spacing regulations protect the oil and gas rights of adjacent leaseholders and landowners and maximize resource recovery by establishing default limits on how close, under the land's surface, oil and gas wells can be to property lines where ownership changes hands. These limits are set forth in regulation 20 AAC 25.055 . Operators must abide by the default limits unless they apply for, and obtain, an order approving an exception to those limits. Although exceptions to the default limits are not unusual, AOGCC carefully evaluates each application, and typically grants them only when actual geologic conditions demonstrate that the proposed subsurface location of a well is necessary to reach otherwise unreachable oil or gas and that both the rights of adjacent leaseholders and landowners and underground drinking water can be protected. As a general matter, AOGCC does not have extensive authority over surface impacts such as noise, emissions, or construction. This notice does not contain all the information filed by Hilcorp. To obtain more information, contact the AOGCC’s Special Assistant, Samantha Coldiron, at (907) 793-1223 or samantha.coldiron@alaska.gov. The AOGCC has tentatively scheduled a public hearing on this matter for September 1, 2026, at 10:00 a.m. via Microsoft Teams. The hearing, which may be changed to full virtual, if necessary, will be held in the AOGCC hearing room located at 333 West 7th Avenue, Anchorage, AK 99501. The audio call in information is (907) 202-7104 Conference ID: 266 010 683#. Anyone who wishes to participate remotely using MS Teams video conference should contact Ms. Samantha Coldiron at least two business days before the scheduled public hearing to request an invitation for the MS Teams. To request that the tentatively scheduled hearing be held, a written request must be filed with the AOGCC no later than 4:30 p.m. on August 4, 2026. If a request for a hearing is not timely filed, the AOGCC may issue an order without a hearing. To learn if the AOGCC will hold the hearing, call (907) 793-1223 after August 6, 2026. In addition, written comments regarding this application may be submitted to the AOGCC, at 333 West 7th Avenue, Anchorage, AK 99501 or samantha.coldiron@alaska.gov. Comments must be received no later than 4:30 p.m. on August 18, 2026, except that, if a hearing is held, comments must be received no later than the conclusion of the September 1, 2026, hearing. If, because of a disability, special accommodations may be needed to comment or attend the hearing, contact Samantha Coldiron, at (907) 793-1223, no later than August 25, 2026. Thomas W. McKay Jessie L. Chmielowski Gregory C. Wilson Chair, Commissioner Commissioner Commissioner Attachments, History, Details Attachments None Revision History Created 7/14/2026 2:27:51 PM by sjcoldiron

Documents

No documents posted for this opportunity.

Contacts

Explore more