Civic AI
Civic AI
Procurement intelligence
SAM.govFA5215-26-R-9001
Open

Wake Island Air Field Fiber Installation

Response deadline
Jul 30, 2026
Due in 4 days
Date posted
Jul 24, 2026

Description

The following description of the requirement is intended to be a summary of the required services and is not intended to be all-inclusive. The contractor shall provide professional services and equipment to successfully engineer, furnish, install and test (EFI&T) 12 new Strands (St) of Single Mode (SM) blown Fiber Optic Cable (FOC) on Wake Island (WI). These fiber strands shall be installed in the new fiber optic distribution panels (FODPs) to be installed by the Contractor. The contractor shall provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, housing, food and other incidentals necessary to meet the requirements as stated in the Statement of Work (SOW).

Classifications

Documents (1)

  • WI Fiber Installation - Sources Sought.pdf
    .pdf111 KBNot yet available

Contacts

Similar contracts

Explore more