Pure Processing Customized Ergonomic Workstation Brand Name or Equal
- Response deadline
- Sep 2, 2026 Due in 2 days
- Date posted
- Aug 31, 2026
- Source
- Open notice
Description
CLARIFICATIONS TO QUESTIONS RECEIVED Questions below have been answered in bold. 1. Accessory Assignment: Please confirm which accessories are intended to be installed on each workstation type, or alternatively provide a configuration diagram or list showing the accessory to workstation mapping. Please see attached diagrams. 2. Quantity Intent: For accessories where quantities exceed the number of workstations (e.g., 16 lighted shelves, 80 plastic bins, 24 wall mounted rails), please confirm whether these quantities represent: o A standardized accessory package per workstation, o Additional departmental accessories not tied to a specific workstation, or o A mix of workstation mounted and wall mounted components. A mix of workstation mounted and wall mounted components. 3. Installation Expectations: Item 0023 (Factory Assembly) states that assembly includes pegboards, accessories, wiring, and channeling. Please confirm whether the VA expects all accessories listed in Items 0001 0022 to be factory installed on the workstations, or whether certain items are intended to be shipped loose for VA installation. All Accessories Listed in Items 0001-0022 to be factory installed on the workstations.
Classifications
Documents (6)
- 120x30 Hybrid w Printer x 3.png.png192 KBNot yet available
- 36C26126Q1223 0001.docx.docx24 KBNot yet available
- Designated Peel x2.png.png234 KBNot yet available
- Designated Peel Pouch w Printer.png.png232 KBNot yet available
- 36C26126Q1223.docx.docx111 KBNot yet available
- Hybrid x2.png.png186 KBNot yet available
Contacts
- Contract Specialistmathew.czeshinski@va.gov559-231-1067
Similar contracts
- 644 Manoscan Ar Cath RegCADue Sep 11, 2026
- Lecanto Community-Based Outpatient Clinic Patient Lift PackageFloridaDue Sep 3, 2026
- AFIT Radioactive Storage Cabinet SolicitationOhioDue Sep 9, 2026
- Getinge Washer DisinfectorMississippiDue Sep 9, 2026
- Motor, Pump, CirculatDue Sep 28, 2026
- Protective Vests for the U.S. Embassy in TegucigalpaFrancisco MorazánDue Sep 15, 2026