FY26 Censis Data Merge
- Response deadline
- —
- Date posted
- Aug 3, 2026
- Source
- Open notice
Description
Page 2 of 2 Network Contracting Office 8 (NCO 8) intends to make a sole source award to Censis under the authority of FAR 13.106-1(b)(1) Soliciting from a Single Source, as no other supplies will satisfy the Agency s requirement. The scope of work includes merging the data from the single-site location (Viera) into the multi-site environment (Lake Nona and Lake Baldwin). The vendor will be responsible for all aspects of planning, execution, and training. Censis is the manufacturer of this product and the only vendor with proprietary licensing to perform this data merge. The period of performance will be within 30 days of award. The NAICS code is 811210 Electronic and Precision Equipment Repair and Maintenance. This notice satisfies the requirement at FAR 5.201(b)(1), to publicize the proposed contract action. This notice of intent is not a request for competitive quotes and no solicitation will be issued. However, interested sources may submit a capability statement to respond to this requirement. The Government will consider responses received by 2:00pm EST on August 7, 2026. Responses will only be accepted via email to Victoria.robles@va.gov using the following title in the email s subject line: 36C24826Q1056 Censis Data Merge. The Government will not reimburse respondents for any costs incurred in preparation of a response to this notice. This will be the only notice of the Government's intent to solicit and award to one source to satisfy this requirement.
Classifications
Documents (1)
- Download36C24826Q1056.docx.docx25 KB
Contacts
- Contracting Officervictoria.robles@va.gov407-646-4282
Similar contracts
- Uninterruptible Power Supply St. Louis VA Medical CenterDue Oct 6, 2026
- Oxford PlasmaLab 100 tool PLC upgrade or its EquivalentNew YorkDue Oct 13, 2026
- Repair/Overhaul of Flat Panel Up Front Controller (FPUFC)GeorgiaDue Nov 25, 2026
- Steris Service Contract | RFQ | 11/01/26-10/31/31MarylandDue Oct 12, 2026
- Isokinetic Probe and WCM2000 Probe Repair and MaintenanceOhioDue Oct 1, 2026
- STX Advanced Instrument OSMO ServiceDue Oct 9, 2026