SAM.gov140P5426R0014
Open
Install Pv Solar System at El Abanico
- Response deadline
- Jul 10, 2026 Closed
- Date posted
- Jun 15, 2026
- Source
- Open notice
Description
Installation of Photovoltaic (PV) Solar Power System at El Abanico The purpose of this amendment is to replace Attachment 0001-SOW with Attachment 0003-Update SOW.
Classifications
Documents (5)
Contacts
Similar contracts
- Micro Gin Motor Control Center UpgradeMississippiDue Oct 26, 2026
- Removal of Abandoned Telecommunications EquipmentDistrict of ColumbiaDue Oct 23, 2026
- Upgrade Fire Detection System at FDC Honolulu, HawaiiHawaiiDue Oct 28, 2026
- IDIQ Joc Total Small-Business Set-Aside for Electrical and Other Wiring Installation Projects at Various Government Facilities Located Within the Marine Corps Logistics Base Barstow, Marine CoDue Oct 28, 2026
- Air Compressor RelocationDistrict of ColumbiaDue Oct 28, 2026
- Fire Alarm Replacement IDIQVirginiaDue Oct 23, 2026