SAM.gov140P5426R0014
Open
Install Pv Solar System at El Abanico
- Response deadline
- Jul 10, 2026 Closed
- Date posted
- Jun 15, 2026
- Source
- Open notice
Description
Installation of Photovoltaic (PV) Solar Power System at El Abanico The purpose of this amendment is to replace Attachment 0001-SOW with Attachment 0003-Update SOW.
Classifications
Documents (5)
Contacts
Similar contracts
- Replace 32 Exhaust Fans, Poplarville, MississippiMississippiDue Sep 9, 2026
- Supply and Install Greenhouse Evaporative Cooling System, Stoneville, MississippiMississippiDue Sep 15, 2026
- FY26 NRM - Install Analog Phone Line to Building 6 - 610A4-26-510IndianaDue Sep 10, 2026
- Replacement of the Outdated Fire Alarm System, Curtius Annex, U.S. Embassy Berlin, GermanyBerlinDue Sep 21, 2026
- N--Ak-Kenai Nwr-Audiovisual RepairDue Sep 21, 2026
- H--Cuga- Upgrade Wr Campground ElectricalDue Sep 21, 2026