SAM.govSPE4A627U0175
Open
Cable Assembly, Power, E
- Response deadline
- Nov 17, 2026 Due in 14 days
- Date posted
- Nov 2, 2026
- Source
- Open notice
Similar contracts
- Connector, Bulkhead, EleDue Nov 13, 2026
- Resistor AssemblyDue Nov 17, 2026
- Rj45 8-Pin Modular PluDue Nov 17, 2026
- Connector, Plug, ElectriDue Nov 17, 2026
- Adapter, ConnectorDue Nov 17, 2026
- 59--JACK BOXDue Nov 13, 2026