5610--Combined Synopsis Solicitation - Base + 4 OY FFP TOPSOIL FOR CALVERTON NATIONAL CEMETERY
- Response deadline
- Aug 24, 2026 Due in 2 days
- Date posted
- Aug 21, 2026
- Source
- Open notice
Description
5. PROJECT NUMBER (if applicable) CODE 7. ADMINISTERED BY 2. AMENDMENT/MODIFICATION NUMBER CODE 6. ISSUED BY 8. NAME AND ADDRESS OF CONTRACTOR 4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE 9A. AMENDMENT OF SOLICITATION NUMBER 9B. DATED PAGE OF PAGES 10A. MODIFICATION OF CONTRACT/ORDER NUMBER 10B. DATED BPA NO. 1. CONTRACT ID CODE FACILITY CODE CODE Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers E. IMPORTANT: is extended, (a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended. 12. ACCOUNTING AND APPROPRIATION DATA (REV. 11/2016) is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A. 15C. DATE SIGNED B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b). RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: D. OTHER Contractor 16C. DATE SIGNED 14. DESCRIPTION OF AMENDMENT/MODIFICATION 16B. UNITED STATES OF AMERICA Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect. 15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER 15B. CONTRACTOR/OFFEROR STANDARD FORM 30 PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.) (Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.) (If required) (SEE ITEM 11) (SEE ITEM 13) (X) CHECK ONE 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT (Signature of person authorized to sign) (Signature of Contracting Officer) 1 2 0001 08/21/2026 36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172 36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172 36C78626Q0097 08/07/2026 X X X 1 The purpose of this Amendment is to answer questions submitted by potential Quoters. See Continuation Page. Sarah Poole Contracting Officer CONTINUATION PAGE Question 1: What type/size of truck and number of trucks are required? Answer 1: The size and number of trucks does not matter. The Contractor must be able to meet each delivery requirement. Per the Statement of Work in the General Requirements paragraph, the cemetery requires the delivery of 1,300 cubic yards of bulk topsoil (not bagged), with the option for an additional 200 cubic yards, per year. Deliveries are needed bi-annually during fall and spring. That is approximately, 650 750 cubic yards per delivery. (End of Document)
Classifications
Documents (2)
- 36C78626Q0097.docx.docx47 KBNot yet available
- 36C78626Q0097_1.docx.docx37 KBNot yet available
Contacts
- Contracting Officersarah.poole1@va.gov703-630-9369
Similar contracts
- Removal of 32 FT Bathroom TrailerMarylandDue Aug 28, 2026
- Removal of 32 FT Bathroom TrailerMarylandDue Aug 28, 2026
- Service, Diesel Fuel and DeliveryDue Sep 4, 2026
- 5610--Combined Synopsis Solicitation - Base + 4 OY FFP TOPSOIL FOR CALVERTON NATIONAL CEMETERYDue Aug 24, 2026
- Z--Round Valley Road Rock HaulingDue Jul 30, 2026
- 5610--Sources Sought - TOPSOIL FOR CALVERTON NATIONAL CEMETERYDue Jul 31, 2026