SAM.govDE-SOL-0005544
Open
54--GREEN FOREST-POPLAR BLUFF-ASHERVILLE STEEL STRUCTURES
Federal Agency
- Response deadline
- —
- Date posted
- May 9, 2013
- Source
- Open notice
Description
The specificationd are general enough that to cover slip or flange joints. The drawings show flanged joints and that is what is required for this procurement. QUESTIONS AND ANSWERS: 1. Will Smooth Round poles will be a considered as an alternative to 12-sided hexagonal poles. ANSWER = NO. 2. The Quantity of poles in the bid schedule differs from the quantities listed on the engineered drawings. ANSWER = Use the quantities of poles listed in the BID SCHEDULE. 3.The ground sleeve in the drawing is shown at 7?-0 long that is, 5?-0 above grade and 2?-0 below grade. The bid description schedule calls out a 5?-0 ground sleeve 3?-0 above grade and 2?-0 below grade. ANSWER = Use the sleeve lengths specified in the SPECIFICATIONS.
Classifications
Documents (1)
- Click here to see more information about this opportunity on FedConnectNot yet available
Contacts
- Sean L. Long