SAM.gov36C25026R0094
Open
4610--Replace Water Softener 539-26-503
- Response deadline
- Aug 26, 2026 Due in 3 days
- Date posted
- Aug 24, 2026
- Source
- Open notice
Description
The intention of this notice is to obtain a full demolition of the existing water softener and replacement with a new basis-of-design Culligan CSM 540-3 ASME Duplex Water Softener System. This includes: Complete demolition/removal of existing softener tanks, brine tank, valves, piping, and controls Rigging and placement of new softener system All new mechanical, plumbing, and electrical work Integration of new softener with existing domestic water and mechanical systems System testing, startup coordination with Culligan, commissioning, and staff training All work shall comply with the requirements of VA Master Spec 22 31 11, related VA sections, and the equipment manufacturer s requirements.
Classifications
Documents (1)
- 36C25026R0094_1.docx.docx15 KBNot yet available
Contacts
- Contracting Officer
Similar contracts
- NCTAMS LANT HVAC Support ServicesVirginiaDue Aug 24, 2026
- Nicolet Crane Barge CO2 Fixed Fire Suppression SystemDue Aug 25, 2026
- 4610--Replace Water Softener 539-26-503Due Aug 31, 2026
- 25Z4AA8 Replace FPC FS Coolers and FreezersIllinois
- Chiller Coil ReplacementDelawareDue Aug 31, 2026
- Supply and replace well head cap and an approximately 18-inch vertical extension, Guilford CTConnecticutDue Aug 24, 2026