SAM.gov80AFRC26SS020
Open
32-Channel Load Control System with Controlled Load Abort Capability
- Response deadline
- Aug 24, 2026 Due in 14 days
- Date posted
- Aug 11, 2026
- Source
- Open notice
Similar contracts
- Purchase of Gate Valve Actuators for Crooked Creek Lake Due Aug 13, 2026
- Intent to Sole Source: Slocumb Gate ActuatorNorth CarolinaDue Aug 19, 2026
- EDrive for Variable Restraint AssemblyGeorgiaDue Aug 14, 2026
- Nickajack Lock Hydraulic Cylinder ReplacementDue Aug 14, 2026
- 30--CYLINDER ASSEMBLY,ACTUDue Aug 18, 2026
- 30--CYLINDER ASSEMBLY,ACTUDue Aug 3, 2026