THE PURPOSE OF THIS MODIFICATION IS TO: 1. RAISE THE SAGEHEN BOAT RAMP VAULT TOILET APPROXIMATELY 10.5 INCHES DUE TO INCORRECT ELEVATIONS REFLECTED ON THE DRAWINGS. 2. INSTALL GRAVEL SUMPS PER DETAIL PROVIDED BY USFS AT THREE LOCATIONS. 3. REMOVE
BURTON CONSTRUCTION, INC. · Department of Agriculture
- Value
- $1,948,926
- Start
- Mar 31, 2025
- End
- Jun 30, 2026
- Action date
- Feb 23, 2026
- PIID
- 1282B124F0143
- Status
- completed
- NAICS
- 236220 · COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION
- Place of performance
- BOISE, ID
- Award type
- DELIVERY ORDER
Description
THE PURPOSE OF THIS MODIFICATION IS TO: 1. RAISE THE SAGEHEN BOAT RAMP VAULT TOILET APPROXIMATELY 10.5 INCHES DUE TO INCORRECT ELEVATIONS REFLECTED ON THE DRAWINGS. 2. INSTALL GRAVEL SUMPS PER DETAIL PROVIDED BY USFS AT THREE LOCATIONS. 3. REMOVE