nc_evpNCCAPE-FEAR-PUBLIC-UTILITY-AUTHORITY
CAPE FEAR PUBLIC UTILITY AUTHORITY / Sweeney WTP 4MG Clearwell Rehabilitation
9 open solicitations
Linked solicitations
- Addendum 1open345-26-C0513-6NCDue Jul 16, 2026
- Cape Fear Public Utility Authority (CFPUA) requests statements of qualifications (SOQ) from consulting engineering firms for Water Supply Long Term Planning.open345-07/07/2026-2NCDue Aug 4, 2026
- The Cape Fear Public Utility Authority (CFPUA) is seeking a qualified engineering firm experienced in the repair and rehabilitation of gravity sewer infrastructure using cured-in-place pipe (CIPP) …open345-07/07/2026NCDue Aug 6, 2026
- Cape Fear Public Utility Authority is accepting bids for the Sweeney WTP 4MG Clearwell Rehabilitation project. Scope of work includes replacement of the expansion joint caulking inside the confined…open345-26-C0513-5NCDue Jul 9, 2026
- The Cape Fear Public Utility Authority (CFPUA) requests statement of qualification from an engineering firm experienced with water storage tank condition assessment services.open345-06/23/2026-3NCDue Jul 28, 2026
- Cape Fear Public Utility Authority (CFPUA) requests Statements of Qualifications (SOQ) from consulting engineering firms for the design and permitting of metering instrumentation installed in exist…open345-06/23/2026-2NCDue Jul 21, 2026
- Cape Fear Public Utility Authority (CFPUA) requests statements of qualifications (SOQ) from consulting engineering firms for the design and contract administration services for a project to install…open345-06/23/2026NCDue Jul 23, 2026
- Cape Fear Public Utility Authority is accepting bids for the Crooked Pine Road Main Extension
project. Scope of work includes installation of a 12” and 8” water main by open cut method and the aban…open345-26-C1217NCDue Jul 21, 2026
- Cape Fear Public Utility Authority is accepting bids for the Find-It Fix-It Water Valve Replacement project. Scope of work includes replacement of broken valves identified or as a result of the wat…open345-26-C1204NCDue Jul 14, 2026