Civic AI
Civic AI
Procurement intelligence
SAM.govW50S8W-26-Q0001
Open

Upgrade UPS & Cooling System

Response deadline
Jun 30, 2026
Closed
Date posted
Jun 1, 2026

Description

The vendor shall provide un-installation of outdated equipment and installation of brand-new items according to acceptable standards. Contractor shall provide Uninterruptible Power and Cooling Distribution Unit replacement/ installation and a Site Lead/Project Manager to provide the following critical tasks to support to the WYANG per the PWS. � 5.3.3 Capture existing cooling fluid/Re-fill system with cooling fluid. � 5.3.4 Demo existing piping � 5.3.5 Run new Pex piping to the in-row coolers. � 5.3.6 Furnish & install new 350A shut Trip Breaker with nema-1 Enclosure. Tie existing EPO into new Shunt Trip breaker. � 5.3.7 Existing 3� Feeder conduit & wire fed from MDP will be shutdown & locked out. Intercept existing Feeder to line side of new 350A Shunt Trip Breaker/Enclosure. Install Load side Feeder conduit & wire from new Shunt Trip Breaker to new UPS. � 5.3.8 Demo existing UPS, remove from Data Center, Dispose/recycle old UPS. � 5.3.9 Install Power Modules and Battery Cabinets � 5.3.10 Assume the existing structural integrity of raised floor is sufficient to move old UPS across floor & new UPS installed at old UPS location. All raised floor modifications by others. SITE VISIT: 10 JUNE 2026 AT 1300 MDT at 217 Dell Range Blvd, Cheyenne, WY 82009 - IF NO REQUEST FOR SITE VISIT ARE RECIEVED BY 08 JUNE 2026 AT 1200 MDT, IT WILL BE CANCELED. QUESTIONS DUE: 12 JUNE 2026 AT 1000 MDT

Classifications

  • NAICS335999
  • PSC6150

Documents

No documents posted for this opportunity.

Explore more