Fiber Optic Cable and installation - Paging System Upgrade and Expansion
- Response deadline
- Jun 30, 2026 Closed
- Date posted
- Jun 12, 2026
- Source
- Open notice
Description
Provide, install, and test a dedicated, independent, underground fiber connection consisting of a 6-strand indoor/outdoor armored plenum single-mode (OS2) fiber optic cable, accessories, and installation to Bldgs. 4 and 12, and a dedicated, independent fiber connection consisting of a 18 or 24-strand indoor armored plenum single-mode (OS2) fiber optic cable(s), accessories, and installation from C-Wing Core (Rm. C-125) to the Penthouse. Includes 1U fiber drawers and LC terminations (as needed), and project management. Fiber should terminate in the same room as the paging/network equipment in each building. Demark terminating at Bldg. 1 is C125 patch panel, run fiber optic above ceiling tiles in C125. Patch panels must be properly labeled.
Classifications
Documents
No documents posted for this opportunity.
Similar contracts
- B118 Fire PanelOhioDue Sep 3, 2026
- Z1DA--460-26-007 | Electrical Distribution Inspection Repairs | NCO 4 Construction East (VA-26-00057558)Due Aug 19, 2026
- POWER SYSTEM GENERATOR & TRANSFER SWITCHES REPLACEDue Aug 28, 2026
- Removal and Replacement of Dishwasher BLDG 20226TexasDue Aug 26, 2026
- Ft. Leavenworth Fire Alarm and Mass Notification System Upgrade, $45M, 5 Year SATOCDue Sep 15, 2026
- Dishwasher Replacement B20626TexasDue Aug 26, 2026