Y1BG--EHRM Infrastructure Upgrades Construction - Kerrville - Project 671A4-21-700
- Response deadline
- Jun 24, 2026 Closed
- Date posted
- Jun 4, 2026
- Source
- Open notice
Description
Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for EHRM INFRASTRUCTURE UPGRADES as required by drawings and specifications. Project scope includes, but is not limited to, the following infrastructure upgrades: Electrical (electrical panel upgrade, power [normal, emergency]); Bonding; UPS; Building Management System interfaces; new/upgraded existing HVAC; reconfiguration, expansion, and renovation of existing space (demo, new construction, finishes, cable); space renovation for Data Center (expanded space, cable management, server rack configuration); communications infrastructure (new Data outlets, patch panels, upgrade to Cat 6A cable) in buildings as necessary; physical security upgrades; upgrade fiber infrastructure backbone campus-wide within buildings and between buildings; provide diversified path for WAN; and Hazardous Materials abatement. Project buildings include 1, 2, 11, 18, 29, 46, 96 and site.
Classifications
Documents
No documents posted for this opportunity.
Similar contracts
- Matsushima JASDF Base Storage ShelterMiyagiDue Sep 11, 2026
- AMENDMENT 0002 - 19KU2026Q0012: Chancery Annex Restroom, Lactation RM &Locker RMs RenovationḨawallīDue Aug 20, 2026
- INDUSTRY DAY AND MARKET SURVEY NOTICE for new ATCT Project at (FLL) Fort Lauderdale-Hollywood International AirportFloridaDue Aug 27, 2026
- Industry Day U.S. Merchant Marine Academy Campus ModernizationNew YorkDue Oct 15, 2026
- 657-26-602 Create Observation Unit JCMissouriDue Sep 1, 2026
- Fort Benning Job Order Contract (JOC)GeorgiaDue Aug 26, 2026