USCGC Stone Steering Pump Diagnosis (no repair)
- Response deadline
- May 26, 2026 Closed
- Date posted
- May 20, 2026
- Source
- Open notice
Description
Scope of Work: CGC Stone- Discrep 26029 PR- 52000PR260025256 Last update 05/19/26 Background: 2B Steering pump lags from 2A when turning in either direction. ASSIST has helped troubleshoot and now the rudder is a bit faster but still lagging significantly while turning. Currently the Cutter only has 1 out of 4 pumps correctly operating which significantly impacts their ability to safely maneuver. Statement of Work: Vendor to provide one technician, must be a Bosch Rexroth authorized technician, for 1 day of work to troubleshoot 2B Steering pump while CGC Stone is at Base Charleston. Work must be performed between 26MAY26-03JUN26. This will be an inspection, troubleshooting/diagnosis, and reporting only. The technician is not authorized to perform any repairs, adjustments, or parts replacement. Service: POP: 26MAY26-03JUN26 Address: CGC Stone 1050 Register St North Charleston, SC, 29405 On?scene coordination POC Stephen Horvath 858-776-7767 Stephen.B.Horvath@uscg.mil Technical Product Line POC Christian Thorn (510) 437-5483 Christian.P.Thorn@USCG.MIL
Classifications
Documents
No documents posted for this opportunity.
Similar contracts
- USCGC GREENBRIER DRYDOCK REPAIRS FY27Due Sep 11, 2026
- DRYDOCK: USCGC MYRTLE HAZARD DD FY27GuamDue Sep 24, 2026
- FABRICATION OF ONE STERN TUBE SHAFT ASSEMBLYARMED FORCES - AMERICADue Aug 27, 2026
- 48--SLEEVE,DIRECTIONALDue Sep 4, 2026
- 59--PLUG ASSEMBLYDue Sep 4, 2026
- Troubleshoot and repair of CBL outdrive for CGC JuniperHawaiiDue Sep 8, 2026