SAM.gov19PE5026R0001
Open
Electrical Subpanel Replacement
- Response deadline
- Jun 10, 2026 Closed
- Date posted
- Jun 5, 2026
- Source
- Open notice
Description
This contract is to provide all labor, materials, equipment, engineering, quality control, safety oversight, and supervision necessary to replace the existing electrical subpanel at the INL warehouse (Air Wing #2) located at the FAP Base�Callao, Lima, Peru. The Contractor shall deliver a safe, code-compliant, fully commissioned system with complete documentation and minimal operational disruption.
Classifications
Documents
No documents posted for this opportunity.
Similar contracts
- B118 Fire PanelOhioDue Sep 3, 2026
- Z1DA--460-26-007 | Electrical Distribution Inspection Repairs | NCO 4 Construction East (VA-26-00057558)Due Aug 19, 2026
- POWER SYSTEM GENERATOR & TRANSFER SWITCHES REPLACEDue Aug 28, 2026
- Removal and Replacement of Dishwasher BLDG 20226TexasDue Aug 26, 2026
- Ft. Leavenworth Fire Alarm and Mass Notification System Upgrade, $45M, 5 Year SATOCDue Sep 15, 2026
- Dishwasher Replacement B20626TexasDue Aug 26, 2026