SAM.gov36C24426Q0619
Open
SPRINKLER SYSTEM INSPECTION AND REPAIR
- Response deadline
- Jun 12, 2026 Closed
- Date posted
- May 28, 2026
- Source
- Open notice
Description
Please review all attachments and solicitation in detail. No questions will be accepted past the due date stated in the RFQ. Please provide all required information. The contractor shall provide all labor, materials, equipment, and supervision required to perform the five-year obstruction inspection, testing, and maintenance of the facility�s sprinkler systems in accordance with NFPA (National Fire Protection Association�s) 25 and applicable codes. Work includes internal pipe assessments, valve inspections, FDC hydrostatic testing, hydrant flow testing, and replacement of 40 sprinkler gauges.
Classifications
- NAICS238220
- PSCJ012
Documents
No documents posted for this opportunity.