oh_dotc:260380
Open
US 40-14.14 — TWO LANE RESURFACING
- Response deadline
- Aug 27, 2026 Due in 14 days
- Date posted
- Aug 13, 2026
- Source
- Open notice
Description
TWO LANE RESURFACING Route/Section: US 40-14.14 District: 7 PID #: 117962
Documents (2)
- Proposal-1092022.pdfapplication/pdf1.4 MBNot yet available
- 260380-planholders.txttext/plain1 KBNot yet available
Similar contracts
- SR 7-32.95 — SLIDE REPAIROHDue Aug 27, 2026
- SR 241-16.86 (PART 1 AND PART 2) — MINOR RECONSTRUCTIONOHDue Aug 13, 2026
- US 6/SR 611-06.86/VAR — BRIDGE REPAIROHDue Aug 13, 2026
- SR 148-03.12 — BRIDGE REPAIROHDue Aug 13, 2026
- IR 75-06.94 Slide Repair — SLIDE REPAIROHDue Aug 27, 2026
- SR 17-13.50 Replace — BRIDGE REPLACEMENT (1 BRIDGE)OHDue Aug 13, 2026