FAS S605(52) FAF-54-1(50)
- Response deadline
- Sep 18, 2026 Due in 36 days
- Date posted
- Aug 13, 2026
- Source
- Open notice
Description
****(1): Job JSR0028 Route 18 HENRY County. Coldmill and resurface on Ohio Street from Montgomery Street to Route 13 in Clinton, the total length of improvement being 2.059 miles.****(2): Job JSR0033 Route 54 CEDAR, ST CLAIR County. Coldmill and resurface On Route 54 from Route 32 near El Dorado Springs to Route MM near Weaubleau, the total length of improvement being 24.92 miles.****(3): Job JSR0442 Route 32 CEDAR County. Coldmill and resurface on Route 32 from Sunset Drive to Hospital Road in El Dorado Springs, the total length of improvement being 0.223 miles.****(4): Job JSR0487 Route 123 POLK County. Coldmill and resurface on Route 123 from Route 32 to Route 215 near Aldrich, the total length of improvement being 11.93 miles. Counties: CEDAR, HENRY, POLK, ST CLAIR Eligibility: Eligible
Documents
No documents posted for this opportunity.
Similar contracts
- FAF 71-4(127)MODue Sep 18, 2026
- FAF-92-1 (37)MODue Sep 18, 2026
- I 435-1(341)MODue Sep 18, 2026
- FAF 5-3(88)MODue Sep 18, 2026
- FAS S404(024)MODue Sep 18, 2026
- FAS S203(057)MODue Sep 18, 2026