ma_commbuysBD-18-2075-WBMLP-WBMLP-28943
Open
Install and interconnect a 120kW (AC) flywheel energy storage system
- Response deadline
- Jul 18, 2018 Closed
- Date posted
- —
- Source
- Open notice
Description
Install and interconnect a 120kW (AC) flywheel energy storage system
Documents
No documents posted for this opportunity.