MCM-9, GATX EVAPORATOR TANK IN 2-23-0-Q; REPAIR AND PRESERVE COLLECTING HOLDING AND TRANSFER PIPING; CHEMICALLY CLEAN
- Response deadline
- Jun 17, 2026 Closed
- Date posted
- Jun 3, 2026
- Source
- Open notice
Description
SASEBO � JAPAN � SASEBO � JAPAN � SASEBO � JAPAN � SASEBO � JAPAN � SASEBO - JAPAN- SASEBO The work is to be performed in �SASEBO�, JAPAN. This solicitation is intended only for sources duly authorized to operate and do business in �JAPAN�, as prescribed by DFARS 225.1103 (3), 252.225-7042. The NAVSUP Fleet Logistics Center (FLC) Yokosuka Site � SASEBO � intends to issue a competitive solicitation for the USS PIONEER (MCM-9) GATX EVAPORATOR TANK IN 2-23-0-Q REPAIR AND PRESERVE COLLECTING HOLDING AND TRANSFER PIPING CHEMICALLY CLEAN to Master Ship Repair Agreement (MSRA) and capable Agreement for Boat Repair (ABR) holders in �Japan�. Please ensure that your company meets these criteria and provides any necessary documentation to demonstrate your authorization to perform this work in � Japan �. Contractors located OUTSIDE Japan that do NOT unambiguously demonstrate compliance with DFARS 252.225-7042 will NOT be eligible to receive an award. Any Offeror who do NOT possess an active MSRA or ABR in the Japan region, or does NOT agree to execute a master agreement (MSRA/ABR) in the Japan Region before award of a job order, will NOT be eligible to receive an award. SASEBO � JAPAN � SASEBO � JAPAN � SASEBO � JAPAN � SASEBO � JAPAN � SASEBO - JAPAN- SASEBO
Classifications
Documents
No documents posted for this opportunity.
Similar contracts
- NOTICE OF INTENT TO SOLE SOURCE CGC SAGINAW CRANE WINCHAlabamaDue Aug 18, 2026
- Flowserve HPU Cooling Pump for Dredge EssayonsDue Aug 17, 2026
- MDC 3372 Key Woods Towboat ReplacementDue Sep 14, 2026
- DOCKSIDE: USCGC ALERT DS1 FY27FloridaDue Aug 21, 2026
- Scaffolding on Bridge Face for Ship's Force Use; rigNagasakiDue Aug 31, 2026
- Tug Demolen DrydockDue Aug 31, 2026