Install and remove scaffolding for support of Ship Alteration - USS Rafael Peralta (DDG-115)
- Response deadline
- Jun 24, 2026 Closed
- Date posted
- Jun 15, 2026
- Source
- Open notice
Description
Install and remove scaffolding for support of Ship Alteration See Work Specifications Package TGI 38K6144107A01 and TGI 38K6144108A03 Thank you very much for interesting this requirement. Unfortunately, this requirement shall be completed in limited timely matter and at a place in U.S. Naval Base Yokosuka Japan to be determined by port operations. Also, Offerors must have a certification of Master Ship Repair Agreement (MSRA) or Agreement for Boat Repair (ABR) programs which have been validated by NAVSUP Fleet Logistics Center (FLC) Yokosuka Contracting Department. Firms who do not possess an active MSRA/ABR with NAVSUP FLC Yokosuka are ineligible for award as a Prime Contractor. This is a competitive, unrestricted action among sources duly authorized to operate and do business in JAPAN. Offerors/Quoters may be required to submit additional documentation demonstrating their ability to perform in Japan prior to award.
Classifications
Documents
No documents posted for this opportunity.
Similar contracts
- NOTICE OF INTENT TO SOLE SOURCE CGC SAGINAW CRANE WINCHAlabamaDue Aug 18, 2026
- Flowserve HPU Cooling Pump for Dredge EssayonsDue Aug 17, 2026
- MDC 3372 Key Woods Towboat ReplacementDue Sep 14, 2026
- DOCKSIDE: USCGC ALERT DS1 FY27FloridaDue Aug 21, 2026
- Scaffolding on Bridge Face for Ship's Force Use; rigNagasakiDue Aug 31, 2026
- Tug Demolen DrydockDue Aug 31, 2026