Parametric Amplifier and Accessories
- Response deadline
- Jun 5, 2026 Closed
- Date posted
- Jun 2, 2026
- Source
- Open notice
Description
*THIS RFQ WILL BE EVALUATED BASED ON LOWEST PRICE, TECHNICALLY ACCEPTABLE METHODOLOGY* Looking to source a Parametric Amplifier and accessories with the following specifications: Raytheon BBN Fully Tested and Characterized JPA System Wide Bandwidth Josephson Junction Parametric Amplifier Tunable Center Frequency: 5.0 � 7.0 GHz Gain: 20 dB minimum Instantaneous Bandwidth: 300 MHz Noise temperature: 295 mK @ 6.8 GHz Matched input: 50 Ohm Compact Aluminum cryo-package Connector In/Out: 2.92mm K connectors - 1x Raytheon BBN JPA with S/N # - 1x JPA Bracket & MuMetal Shield - 1x Short cable 2.625" - 1x Cable 8.625" - 1x LNF Circulator LNF-CIC4_8A with 2nd mumetal shield - 1x Bias Tee - 1x LC Absorptive Filter Non-magnetic Cryogenic DC Block Broadband High out of Band Rejection Low Insertion Loss Compact Design Cryogenic Functionality (operates down to 10 mK) Pass Band: 0.2 to 18 GHz Block Band: DC to 500 kHz, 20 dB Insertion Loss: 0.5 dB Return Loss: 20 dB Connectors In/Out: SMA F/M Housing Material: Brass Finish: Abaloy Length: 1.03 inches connector to connector Please review all applicable documentation and provide a proposal response no later than 4:00 PM CST June 5, 2026. Within your proposal, please include: a fully executed copy of the ANL-70 Request for Quotation. a completed copy of the ANL-70A Reps & Certs the country of origin for the quoted equipment Any questions can be directed to the Contracting Officer. Thank you in advance for your participation.
Classifications
Documents
No documents posted for this opportunity.
Similar contracts
- FAB-T HEMP FiltersNebraskaDue Aug 30, 2026
- KEYSIGHT N8487A POWER SENSORSouth CarolinaDue Aug 21, 2026
- 12FPC426Q0055 NRCS Michigan EMI SensorMichiganDue Aug 31, 2026
- NOTICE OF INTENT TO SOLICIT ONLY SOURCE FOR A HIGH POWER, RF-EXCITED, CO2 LASER.New MexicoDue Aug 18, 2026
- Vector Network AnalyzerOhioDue Aug 31, 2026
- 66--METER,SPECIAL SCALEDue Aug 24, 2026