LAKE SINCLAIR DUMP STATION REPAIR
- Response deadline
- May 29, 2026 Closed
- Date posted
- May 20, 2026
- Source
- Open notice
Description
This project is intended to repair the damaged septic drain line of a RV dump station. The work for this project shall consist of the construction and associated site work for the following base items: Cutting and removing the concrete around the hydrant area to access the damaged section of pipe. Excavating a trench using tractor equipment, including the operator, labor, and materials. Jackhammering concrete as needed to expose the broken line. Removing the damaged pipe section, including any failed fittings. Replacing the affected portion of the line with new line/piping and proper fittings. Backfilling the trench once repairs are complete. Pouring new concrete over the area and finishing it to a rough grade (this includes the concrete barrier stop). Soil erosion control/site stabilization measures *Optional items: Replacing 2 barrier wooden logs (shall be staked or fastened to ground so they remain stabilized in place) Replacing 6 wooden pole logs Replacing 2 wooden signposts (install existing signs on new posts)
Classifications
Documents
No documents posted for this opportunity.
Similar contracts
- Sources Sought – Grease Trap and Used Cooking Oil Containment ServicesCaliforniaDue Aug 26, 2026
- CATM Firing Range CleaningRhineland-PalatinateDue Sep 8, 2026
- J045--Grease Trap Maintenance Base 4CODue Sep 3, 2026
- SCRAP METAL AGREEMENTRhode IslandDue Aug 28, 2026
- Portable Toilets, Vault Pumpouts Toilets & Septic Tank PumpoutsOregonDue Aug 21, 2026
- Sources Sought Oil Water Separator Maintenance ServiceColoradoDue Aug 31, 2026