SAM.gov140L3726Q0076
Open
FY26 WEST DOLORES RIM MASTICATION
- Response deadline
- Jun 26, 2026 Closed
- Date posted
- Jun 11, 2026
- Source
- Open notice
Description
The West Dolores Rim Mastication Project will treat approximately 132 acres of Bureau of Land Management (BLM) lands near Egnar, Colorado, within the Tres Rios Field Office. The project involves mechanically masticating pinyon and juniper vegetation to reduce hazardous fuels, improve wildlife habitat, and open overly dense canopy conditions. Work includes the selective removal of 50 percent of live pinyon and juniper trees�balanced proportionally between species�and the removal of 50 percent of shrubs over 36 inches in height. Mastication will convert targeted vegetation into mulch to reduce fuel continuity, enhance ecosystem resilience, and support long�term habitat objectives.
Classifications
Documents
No documents posted for this opportunity.
Similar contracts
- F--FY26 BMDO ROADSIDE FUELBREAK HERBICIDEDue Sep 3, 2026
- Wayne National Forest, Phase 1 Heritage/Archeology SurveysOhioDue Sep 2, 2026
- Slater Fire Roadside Danger Tree Fuels - LMIR BPA Holders OnlyOregonDue Aug 28, 2026
- AL-WHEELER NWR-MULCHING TEN ACRESDue Aug 24, 2026
- F--16.5 ROAD MANUAL HAZARD FUELS REDUXDue Sep 2, 2026
- FY26 BMDO ROADSIDE FUELBREAK HERBICIDEDue Sep 3, 2026