N041--Cancer center RTU-3 temporary unit replacement with new unit (Amendment# 2)
- Response deadline
- Aug 26, 2026 Due in 2 days
- Date posted
- Aug 24, 2026
- Source
- Open notice
Description
PURPOSE OF AMENDMENT The purpose of this amendment is to answer the questions of contractors that attended the site visit for the Cancer Center RTU-3 replacement, conducted at the West Palm Beach VA Medical Facility. This amendment uploads the following documents for Contractor usage. As part of the process, please keep in mind the following contractor s responsibilities: - Crane and safety lift plans are required. - Contractors must verify the location of the VFD. - Contractors will be responsible only for the crane lift of the new replacement unit, as the existing rental unit contractor handles the rental removal. - Contractors must ensure the connection from the chilled water and heating valve to the new unit. -Testing adjusting and balance (TAB) to ensure unit performance Attachments: York Unit Description- Drawings AHU Performance Report
Classifications
Documents (12)
- 36C24826Q1106_2.docx.docx17 KBNot yet available
- attachmentNot yet available
- 3- PAST PERFORMANCE QUESTIONNAIRE.docx.docx24 KBNot yet available
- 36C24826Q1106_1.docx.docx15 KBNot yet available
- 3a- PAST PERFORMANCE QUESTIONNAIRE.pdf.pdf104 KBNot yet available
- 1- Combined Synopsis.pdf.pdf178 KBNot yet available
- York Unit Description - VA WPB Cancer Center RTU-3 8.14.25.docx.docx24 KBNot yet available
- VA WPB Cancer Center RTU-3 DrawingREV08-15.pdf.pdf783 KBNot yet available
- 36C24826Q1106.docx.docx15 KBNot yet available
- VA WPB Cancer Center RTU-3 - AHU Performance reportR1.pdf.pdf419 KBNot yet available
- 2- Statement of Work RTU Replacement Unit.pdf.pdf274 KBNot yet available
- ANSWERS TO CONTRACTOR QUESTIONS.pdf.pdf144 KBNot yet available
Contacts
- Contracting Officermalcolm.davis@va.gov561-517-1793
Similar contracts
- USCG SECTOR NEW YORK – RENEW GALLEY STAFF LOCKER ROOMS SECNYHAB01New YorkDue Aug 30, 2026
- Water Plant Altitude Valve Repair ServicesTexasDue Sep 7, 2026
- J039--Annual HVAC Building Automation System (BAS) Service AgreementVADue Aug 28, 2026
- Triadelphia - B1 HVAC ChillerWest VirginiaDue Aug 31, 2026
- STA Oregon Inlet Maintenance Building HVAC ReplacementNorth CarolinaDue Sep 17, 2026
- N-26 Provide and Install Mountable AC Units in Server RoomDue Aug 25, 2026