OpenGov / Ionwave2026-ITB-369
Open
Floyd Little Athletic Center Flooring
- Response deadline
- Jun 24, 2026 Closed
- Date posted
- May 28, 2026
- Source
- Open notice
Description
This project involves the flooring replacement for a large hallway and atrium/ lobby, two vestibules, and four two-story stairways. Remove existing resilient flooring. Repair aluminum curtain wall sill plate in vestibules. Perform moisture mitigation on slab-on-grade. Install walk off mat in vestibules, rubber flooring in stairs and rubber flooring with a pattern in multiple colors in the hallway and atrium/ lobby.
Documents
No documents posted for this opportunity.