FMS; Qty 1; 014133910
- Response deadline
- Jun 19, 2026 Closed
- Date posted
- May 19, 2026
- Source
- Open notice
Description
Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor?s facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract. Required RTAT: 385 days after receipt of asset. Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERS DELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT�S ACCEPTANCE OF THE CONTRACTOR�S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. Early and incremental deliveries accepted and preferred
Classifications
Documents
No documents posted for this opportunity.
Similar contracts
- CompressorsDue Aug 27, 2026
- 4110--Upright Freezers and LN2 ContainerCADue Aug 27, 2026
- N--Replacement Walk-in Freezer System, Parts and InstMassachusettsDue Aug 28, 2026
- Basic Expeditionary Airfield Resources (BEAR) Environmental Control Unit (ECU)Due Sep 18, 2026
- 6515--Helmer fridge pedestalsDue Aug 28, 2026
- ICESEA Model ICSH1200-230-60-FSQDue Sep 5, 2026